Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 12, 2025 at 8:00 PM
Updated September 13, 2025
Site work and new construction of a pre-engineered storage facility in Thornton, Colorado. Working plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.
**As of September 12th, 2025, the owner has determined a prequalified list of design build companies. A timeline for the award has not yet been established.** Reference Number 0000390859 This Project consist of Professional Services from general contractors for the design and construction of one (1) or two (2) storage structures, consisting of steel shipping containers with a metal roof kit between them, walls at each end with an overhead door and a standard door, with interior lighting and convenience outlets. The total cost of design and construction shall not exceed one hundred seventy thousand dollars ($170,000.00). Question Deadline 07/21/2025 at 5:00 PM MT Questions are submitted online No, All questions shall be directed in writing to Adam Reiner, Contract Administrator, 9500 Civic Center Drive, Thornton, CO 80229-4326, fax 303-538-7556, or e-mail - adam.reiner@ThorntonCo.gov. Bonding Requirements - Performance Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 Thornton reserves the right to reject any and all Proposals, in part or in whole, and to award the Project to the most responsive and responsible firm(s) as deemed in the best interest of Thornton; further, the right is reserved to waive any formalities or informalities contained in said Proposal(s).
Final Planning
Warehouse / Distribution - Pre-Engineered Storage Building
$180,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
12
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 15, 2025
October 1, 2025
12450 Washington St, Thornton, CO
Related To This Project
Thornton, CO
--
Thornton, CO
--
Thornton, CO
Bid Date: Jul 22 2025
Thornton, CO
Bid Date: Jul 22 2025
Thornton, CO
Bid Date: Aug 06 2025
Thornton, CO
Bid Date: Aug 12 2025
Thornton, CO
--
Thornton, CO
--
Thornton, CO
Bid Date: Jul 03 2025
Thornton, CO
--
Thornton, CO
Bid Date: Jun 25 2025
Thornton, CO
Bid Date: Jun 30 2025
Thornton, CO
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
