BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 22, 2025 at 8:00 PM

Updated August 26, 2025

Site work for a sidewalk / parking lot in Meeker, Colorado. Completed plans call for site work for a sidewalk / parking lot.

BLM-CO LO7 KIDS OHV TRAILThis is a solicitation announcement to construct safe and traversable Off-Highway Vehicle (OHV) trails for children and beginners within the Bureau of Land Management LO7 Open OHV Area Rio Blanco County, CO. LO7 Open OHV Area is located 4 miles South of Meeker Colorado. Socio-economic Categories: While this procurement remains a competitive Total Small Business Set-Aside, the BLM highly encourages and welcomes quotes from all sub-categories of small business such as Small Disadvantaged, Woman Owned, Service Disabled Veteran, HUBZone, 8a, and Indian Small Business Economic Enterprises.1.1 PROJECT DESCRIPTIONThe objective of this project is to construct safe and traversable Off-Highway Vehicle (OHV) trails for children and beginners within the LO7 Open OHV Area. The design will incorporate various features, including basic riding techniques such as starting, stopping, and steering, along with obstacle navigation that includes small hills, rocks, and ramps. The course will progressively increase in difficulty to build confidence and competencies in young riders, as well as provide opportunities for practicing uphill and downhill maneuvers. 1.2 LOCATIONLO7 Open OHV Area is located 4 miles South of Meeker Colorado. The Lat/Long of LO7 Open OHV Area is located at: 39 58'25.28"N -107 55'35.61"W The start of the -Kids Corner- trail is located at: 39 58'22.90"N, -107 55'28.37"W. The start of the -Beginner Plus- trail is located at: 39 58'23.62"N, -107 55'35.87"W. 1.3 WORK SCHEDULEWork is not allowed on Federal holidays. Work shall occur Monday through Friday. Period of Performance: 10/01/2025-11/03/2025.Rough Order of Magnitude - Between $25,000 and $100,000.Basic Contracting Requirements:1. Active Registration - www.sam.gov - check it now please. Updates and registrations have been taking longer than they used to due to the transition from the DUNS number to the UEI. If having issues, don't pay anyone. Free assistance is available at your local PTAC - https://www.aptac-us.org/2. Invoicing and Payment - www.ipp.gov - 14 day prompt pay with progress payments3. FAR Part 13 - Simplified Acquistions4. FAR Part 36 - Construction Provisions and Clauses5. Davis Bacon Act Wages for Rio Blanco County, CO6. Total Small Business Set-Aside for NAICS 237990 (Other Heavy and Civil Engineering Construction)- Size Std: $45M7. Bid, Performance and Payment Bonding8. Type of Contract - Firm Fixed Price9. Basis of Award - Price and other FactorsMinimum Requirements for Responsive Quote:1. Filled in, priced, dated and signed SF1442 with acknowledgement of all amendments.2. Schedule B filled in with prices.3. Technical Response per Section L and M.4. Email items 1-3 above to the POC no later than the solicitation close date.Primary POC: Contracting Officer Courtni Strickland c1strickland@blm.gov Period of Performance: 10/01/2025 to 11/03/2025 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Sidewalks / Parking Lot

$100,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
15
Bidding Soon
161
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2025

October 1, 2025

Project location map

To Be Determined, Meeker, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.