Published August 22, 2025 at 8:00 PM

Updated August 23, 2025

Site work and paving for a mixed-use development in Santa Cruz, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

**As of August 22, 2025, this project has not yet been awarded. The project is expected to be awarded on August 26, 2025.** The purpose of the Pacific-Beach Roundabout Improvement project (c402507) is to provide a new bike lane crossing of the railroad tracks at the northeast portion of the Pacific-Beach roundabout at the head of the Wharf. The new northbound bike lane will provide a near perpendicular crossing of the railroad tracks, which is the recommended crossing method. It includes widening the street by approximately 5 feet which requires demolition of a portion of the street, decorative sidewalk, curb and gutter, utilities, and a retaining wall. Construction includes new and relocated public improvements, such as new decorative sidewalks, curb and gutter and paving; streetlights, Railroad Flashing Light Assembly and utility relocations; storm drain; new retaining wall and either reused or new guard railing; striping and signage. The project is adjacent to 3 business that require access coordination with the owners and tenants. The project is intended to start after Labor Day, on or around September 2, 2025. The Railroad Flashing Light Assembly relocation and related work can only be performed by Summit Signals, and the contractor will be required to have them as a subcontractor to facilitate coordination and construction. Flagging may be required for the Roaring Camp recreational railroad. An allowance is provided for this on the bid sheet. Engineers Estimate : $430,000 The City of Santa Cruz was incorporated in 1866 and formed its current charter in 1948. It is governed under a Council/Manager form of government. A Mayor and six Council members set policy for the City and a City Manager serves as chief administrator of those policies. The City is located on the coast, 75 miles south of San Francisco on the northern edge of the Monterey Bay. It encompasses 15.8 square miles with cultural and ethnic diversity among its population of 65,000. Santa Cruz is part of the National Marine Sanctuary and is a popular tourist destination owing to its beaches, surf culture, and historical landmarks. The City provides a full range of municipal services and facilities including a recreational wharf, public golf course, over thirteen hundred acres of open space, full beach services, refuse management, law enforcement, fire protection, and water and wastewater utilities. The City is also host to University of California Santa Cruz, the Santa Cruz Harbor, and the Santa Cruz Beach Boardwalk amusement park. Question Deadline 06/13/2025 at 3:30 PM PT Response to bidder(s) IFB Questions and Clarification & Issue Addenda:June 17, 2025, 3:30pm If you have any questions concerning this solicitation, please ask questions utilizing City's e-Procurement Question & Answer feature. The Project to be performed consists of furnishing all labor, materials, tools, equipment, and transportation required to complete the Project, with a scope of work to generally include, but is not limited to, the following: Widening the northeast corner of the Pacific and Beach Roundabout by demolishing and replacing the retaining wall, sidewalk, curb and gutter, access ramps, asphalt pavement and some utilities. The existing streetlights, a railroad post and signal, and retaining wall railing will be salvaged and relocated (or protected in place), on the project.

Bid Results

Sidewalks / Parking Lot

$743,243.00

Public - City

Paving, Site Work

19

17

10

8

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
385
Active Projects
174
Bidding Soon
2,161
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2025

September 2, 2025

Project location map

Multiple Locations, Santa Cruz, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.