BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 12, 2025 at 8:00 PM

Updated June 14, 2025

Site work and paving for a mixed-use development in Saint John, Indiana. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

DESCRIPTION OF WORK: This work will include the removal and replacement of existing playground equipment, installation of Pour-in-Place play surface, underdrain and storm design, ADA improvements, concrete sidewalk removal and replacement, and hot-mix asphalt surface and intermediate course removal and replacement at Timberlane Park in St. John, Indiana. Bids shall be properly and completely executed on bid forms contained in the Contract Documents obtainable from the Clerk-Treasurer's Office as stated above. No bidder may withdraw his proposal within a period of sixty (60) days following the date set for receiving bids. The City/Town County (Board of Works) reserves the right to retain any and all bids for a period of not more than sixty (60) days, and said bids shall remain in full force and effect during said time. The Council (Board of Works) further reserves the right to waive informalities, and to award the contract to any Bidder, all to the advantage of the Town of St. John, or to reject all bids. BID SECURITY: Each bid shall be accompanied by an acceptable certified check or cashier's check made payable to the Town of St. John or an acceptable bid bond in an amount equal to five (5%) percent of the total bid price executed by an incorporated surety company in good standing and qualified to do business in the State of Indiana. BONDS: A performance bond and payment bond each in the amount of one hundred percent (100%) of the contract price will be required. Each bidder must ensure that all employees and applicants for employment are not discriminated against because of their race, creed, color, sex or national origin. This project is being funded in part by the Department of Housing and Urban Development through the Lake County Community Economic Development Department. The remaining portion of the project shall be funded through local funds. Total available funds for FY 2024 to the Town of St. John is $75,000, which represents approximately 30% of the estimated cost of the project.

Post-Bid

Playgrounds / Parks / Athletic Fields

$200,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

13

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
460
Active Projects
238
Bidding Soon
3,141
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2025

July 14, 2025

Project location map

11825 W 90th Ave, Saint John, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.