Published July 18, 2025 at 8:00 PM
Updated July 19, 2025
Site work and paving for a road / highway in Saint John, Indiana. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The project is understood to consist of pavement improvements along US 41 from Ridge Road (RP 267+65) to 175th Street (RP 269+07) in Lake County, Indiana. Per the Stage 2 Plans provided by Hanson Professional Services, Inc. (Hanson), dated September 7, 2023, the project starts from Station 12+73.00, Line "US 41" and ends at Station 100+40.00, Line "US 41". The total length of the project is approximately 1.66 miles. The existing US 41 within the project limits is an asphalt surfaced, four lane bidirectional roadway with multiple turn lanes. The roadway is divided by a raised median or a grass median along the majority of the alignment. A center turn lane is present from north of Ridge Road to just south of 81st Street, for a length of approximately 0.42 miles. Curb and gutters are generally present at the edges of the roadway from the beginning of the project (Ridge Road) to Cabela Drive, for a length of approximately 1.15 miles. Various width outside and inside shoulders are generally present from Cabela Drive to the end of the project (175th Street), for a length of approximately 0.5 miles. Furthermore, exit and entry ramps are present at the northern end of the project at the SR 41 interchange with I-80/I-94. Based on the plans and information provided by Hanson, it is understood that the portions of the ramps with asphalt surface are part of this project and will be milled and overlaid along with the US 41 mainline lanes. Please refer to Appendix III and Appendix IV for additional project details. Based on the provided plans, it is understood that maintenance of traffic (MOT) is planned to be phased utilizing the existing mainline lanes. Based on the plans and correspondence with Hanson, it is understood that the shoulders are not planned to be utilized for MOT and interstate ramps will be closed with detours. As such, a detailed evaluation of the existing shoulders for the support of the traffic during MOT operations, as well as recommendations for shoulder strengthening, were not performed for this project. This report includes recommendations for overlay for the entire alignment and patching for the observed surface distresses. 2100238 P.E., 2100238 CONST Project Control No: 2100238 Federal/state No: 2100238 Location Hma Overlay, Preventive Maintenance Lake County - on Us 41 From Ridge Road to 175th Street (Rp 267+0065 to 269+0007) Completion Date: October 31, 2025 Qualifications: B(A) All Bidders Must Be Prequalified and Have Proper Qualifications and Bidding Capacity. An Executed Bid Bond Shall Be Included With All Bids. Only Electronic Bid Bonds Submitted Through the Designated Electronic Medium, Either Surety2000 or Tinubu Surety Solution, Will Be Accepted With the Bid. A Fully Executed Performance Bond Shall Be Included With All Bids, Except on Contracts for Roadside Mowing, Vegetation Control, Demolition, Landscaping, Fencing, Seeding and Sodding, Bridge Painting, and Guardrail Installations of $100,000 or Less, When the Bidder May Elect Not to Furnish a Performance Bond. Electronically Does Not Support Submittal of the Performance Bond. The Performance Bond Must Be Submitted to the Construction Letting Email Inbox or Be Delivered on Paper by the Time Set for Receipt of Proposal Bids. Each Contractor That Submits a Proposal Bid in the Amount of $150,000 or More for Highway Improvements Described in This Notice is Required to Submit With That Bid a Written Plan for a Program to Test the Contractor's Employees for Drugs. The Plan Shall Be in Compliance With Indiana Code 4-13-18. The Plan Must Be Submitted to the Construction Letting Email Inbox or Deposited With the Indot Engineer by the Time Set for Receipt of Proposal Bids. INDOT - Call 251 - HMA Overlay, Preventive Maintenance - US 41 Rii Project No. I-22-059 Questions from interested parties concerning a contract shall be submitted at least five business days prior to the contract's scheduled letting date and time if an answer is desired prior to the letting
Award
Roads / Highways
$2,174,753.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 9, 2025
September 8, 2025
US-41, Saint John, IN
Related To This Project
Saint John, IN
Bid Date: Aug 13 2025
Saint John, IN
Bid Date: Dec 30 2025
Saint John, IN
Bid Date: Dec 16 2025
Saint John, IN
Bid Date: Dec 04 2025
Saint John, IN
Bid Date: Dec 30 2025
Saint John, IN
Bid Date: Jun 13 2025
Saint John, IN
Bid Date: Mar 12 2025
Saint John, IN
Bid Date: Dec 06 2024
Saint John, IN
Bid Date: Aug 27 2024
Saint John, IN
Bid Date: Jul 31 2024
Saint John, IN
Bid Date: Nov 21 2023
Saint John, IN
Bid Date: Jul 17 2023
Saint John, IN
Bid Date: Jul 17 2023
Saint John, IN
Bid Date: Jul 12 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.