BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 9, 2025 at 8:00 PM

Updated July 10, 2025

Site work and new construction of a transportation facility in Milton, Florida. Completed plans call for the construction of a transportation facility; and for site work for a transportation facility.

Questions concerning this request should be submitted through the procurement portal by 3:00 pm on Wednesday, June 11, 2025. Santa Rosa County Board of County Commissioners encourages all segments of the business community to participate in its procurement opportunities, including small businesses, minority/women owned businesses, and disadvantaged business enterprises. The Board does not discriminate on the basis of race, color, religion, national origin, disability, sex, or age in the administration of contracts. The Board of County Commissioners reserves the right to waive irregularities in bids, to reject any or all bids for sound documented reasons, and to award the bid that it determines to be in the best interest of Santa Rosa County. A. Provide and install all equipment, labor, material and accessories, and mounting hardware for a complete and operating system as described within these Division 26 Specification Sections. B. Furnish, perform, or provide all labor including planning, purchasing, transporting, storing, installing, testing, cutting and patching, trenching, excavating, backfilling, coordination, field verification, equipment (installation and safety), supplies, and materials necessary for the installation of complete electrical systems (as described or implied by these specifications and the applicable drawings) in strict accordance with applicable codes, which may not be repeated in these specifications, but are expected to be common knowledge of qualified Bidders. C. All work shall comply with all applicable codes as a minimum and with the additional requirements called for in these Contract Documents. D. Only trained and licensed personnel shall perform work. No Work shall be performed which violates applicable Codes, even if called for in the Contract Documents. E. Coordinate requirements with Utility Company. F. Make connections of all items in the Work using electric power including wire, conduit, circuit protection, disconnects and accessories. Securing of roughing-in drawings and connection information for equipment involved shall also be included under this division. See other divisions for specifications for electrically operated equipment. QA - 6/10/25: Yes. Since this is a federally funded project, David Bacon Wage Rates are required. Vehicle Exhaust Removal and Air Purification Systems are not a requirement of this project.

Bid Results

Transportation Terminals

$1,505,072.00

Public - County

New Construction, Site Work

47

21

66

8

Subscribe For Documents

82 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
13
Bidding Soon
773
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2025

July 18, 2025

Project location map

5550 N Airport Rd, Milton, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.