Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 30, 2025 at 8:00 PM
Updated June 21, 2025
Site work and paving for a road / highway in Milton, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Counties: Escambia Road Name: SR 8 (I-10) Limits: From Perdido River Br to W of Sr 95 (Us 29) and at Pine Forest Interchange Project(s): 22241225201(*) Federal Aid No: D324020B Project(s): 43790545201 Federal Aid No: D325003B Total Roadway Length: 7.824 Miles Total Bridge Length: 0.343 Miles Total Proposal Length: 8.167 Miles Contract Days: 469 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Days Please read the full advertisement Description: The Improvements under this Contract consist of 222412-2-52-01: Resurfacing, Rehabilitation, & Restoration of State Road (SR) 8 (I-10) from Perdido River Bridge to West of SR 95 (US 29), in Escambia County and 437905-4-52-01: Interchange Improvements on SR 8 (I-10) @ Pine Forest, in Escambia County. Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Departments budget. Question Deadline 05/21/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 015 - Resurfacing - SR 8 (I-10)
Bid Results
Roads / Highways
$19,832,809.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 28, 2025
July 28, 2025
FL-8, Milton, FL
Related To This Project
Milton, FL
Bid Date: Sep 04 2025
Milton, FL
Bid Date: Jun 23 2025
Milton, FL
Bid Date: Jun 18 2025
Milton, FL
Bid Date: Jun 30 2025
Milton, FL
Bid Date: Jun 20 2025
Milton, FL
--
Milton, FL
Bid Date: Jun 20 2025
Milton, FL
Bid Date: Jul 11 2025
Milton, FL
Bid Date: Jun 13 2025
Milton, FL
--
Milton, FL
--
Milton, FL
Bid Date: May 12 2025
Milton, FL
Bid Date: Apr 28 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
