BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 24, 2025 at 8:00 PM

Updated October 25, 2025

Renovation of a municipal facility in Milton, Florida. Working plans call for the renovation of a municipal facility.

The owner has determined a prequalified list of general contractors. A timeline for construction has not yet been established.” prequalified bidders: Anchor + Axle Co Fred Simmons, John Loftis, and Thomas Dunne Milton Marina, Waterfront Development Opportunity Question Deadline 07/09/2025 at 2:00 PM CT Questions should be submitted in writing and directed to the Purchasing Department at (850) 983-5480 or by e-mail to mwilliams@miltonfl.org Answers will be posted in an addendum by Wednesday, July 16, 2025 at 2:00 p.m. (CST). The City of Milton, FL (City) (pop. 10,957) is seeking proposals from experienced individuals or firms interested in developing a marina, restaurant/entertainment, and/ or mixed-use development project on four (4) city-owned waterfront properties totaling 3.73 +/- acres along the Blackwater River. Qualified respondents must demonstrate the ability to design, finance, and construct projects in accordance with the terms, conditions, and specifications contained in this Request for Proposal (RFP). The City has been assembling riverfront property for redevelopment on the west bank of the Blackwater River. The objective of this RFP is to revitalize the former marina and stimulate investment in underutilized land to create a destination for the city. The city-owned property available for development is approximately 3.73 +/- acres at the northern edge of the City Limits. It is anticipated, based on market demand, that the preferred use project on the lands available in this RFP will consist of a marina, restaurant/entertainment, and commercial uses. All proposals should enhance the quality of life for Milton area residents and visitors. A successful project will add vibrancy and enhance the public access to the waterfront. Proposed projects should be respectful and compatible with the surrounding area, but clearly signal a new direction for the Milton Waterfront. The City contemplates to establish a 50 ft. public access along the water's edge to create a public park strip. This aspect should be anticipated and detailed in the proposal. If additional parcels are acquired and dedicated to the project, additional easements to allow expanded public access to the waterfront is highly encouraged and desired. Due to grant restrictions, the "North Marina" parcels must include a public marina use, but additional uses may be allowed. The grant restrictions can be removed if the full amount of the grant ($375,000) is reimbursed to the Santa Rosa County Tourist Development Council. If the grant is not repaid, the TDC will be required to approve all projects. The "South Marina" parcel may be utilized for any allowable use in conformance with the property's zoning or rezoning. Standard municipal utilities are in place and easily accessible to the subject properties. This includes City water, sewer, and natural gas. Upgrades will be made through the Broad Street CDBG Grant to increase water main size and hydrant pressure. Stormwater considerations are regulated by Santa Rosa County and should be discussed in the proposal. As these parcels are directly adjacent to a protected natural body of water, environmental considerations should be detailed in the proposal. Conservation of trees located on the properties should be detailed. As waterfront properties, significant consideration should be given by each respondent to the FEMA Flood Plain regulations to build on these parcels. The flood maps for this area were updated in 2024. The winning proposal will be consistent with the City's vision for this area as articulated in the CRA and Riverfront Master Plans. Creative alternatives are welcome. Proposals that pair the City parcels with other, privately owned parcels to create a more expansive, dynamic project are encouraged and preferred.

Final Planning

Municipal

$350,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
40
Bidding Soon
744
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2025

October 28, 2025

Project location map

To Be Determined, Milton, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.