BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2025 at 8:00 PM

Updated August 13, 2025

Site work for a bridge / tunnel in Powderhorn, Colorado. Completed plans call for site work for a bridge / tunnel.

BLM-CO GFO RED BRIDGE CAMPGROUND IMPROVEMENT This is a solicitation announcement for a campground expansion project located at the Bureau of Land Management Red Bridge Campground in Gunnison County, Colorado. Red Bridge Campground is 10 miles South of Lake City, CO on Blue Mesa Road. Google maps address: 2258 Blue Mesa Rd, Powderhorn, CO 81243 Socio-economic Categories: While this procurement remains a competitive Total Small Business Set-Aside, the BLM highly encourages and welcomes quotes from all sub-categories of small business such as Small Disadvantaged, Woman Owned, Service Disabled Veteran, HUBZone, 8a, and Indian Small Business Economic Enterprises. 1.1 PROJECT DESCRIPTION The work includes, but is not limited to; toilet parking and access construction, demolition of wood barriers and wood bollards, and boulder placement. 1.2 LOCATION From Powderhorn Colorado: travel south on highway 149 towards Lake City for approximately 8 miles. Turn right on Blue Mesa road, travel approximately 2 miles, the campground is on the left. The campground can be found by searching "Red Bridge Campground" in google maps. Google maps address: 2258 Blue Mesa Rd, Powderhorn, CO 81243 1.3 WORK SCHEDULE Work shall be completed within 150 days of the Notice to Proceed. Work is not allowed on Federal holidays. Work shall occur Monday through Friday. Contract time will be paused, upon request, when snow or snowmelt prevents work at the project site. Period of Performance: Work shall be completed within 150 days of the Notice to Proceed. Rough Order of Magnitude - Between $25,000 and $100,000. Basic Contracting Requirements: 1. Active Registration - www.sam.gov - check it now please. Updates and registrations have been taking longer than they used to due to the transition from the DUNS number to the UEI. If having issues, don't pay anyone. Free assistance is available at your local APEX- https://www.apexaccelerators.us/#/ 2. Invoicing and Payment - www.ipp.gov - 14 day prompt pay with progress payments 3. FAR Part 15 - Contracting by Negotiation 4. FAR Part 36 - Construction Provisions and Clauses 5. Davis Bacon Act Wages for Gunnison County, CO 6. Total Small Business Set-Aside for NAICS 237990 (Other Heavy and Civil Engineering Construction)- Size Std: $45M 7. Bid, Performance and Payment Bonding maybe required 8. Type of Contract - Firm Fixed Price 9. Basis of Award -Price and other Factors Minimum Requirements for Responsive Quote: 1. Filled in, priced, dated and signed SF1442 with acknowledgement of all amendments. 2. Schedule B filled in with prices. 3. Technical Response per Section L and M. 4. Email items 1-3 above to the POC no later than the solicitation close date. Primary POC: Contracting Officer Courtni Strickland c1strickland@blm.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Bridges / Tunnels

$100,000.00

Public - Federal

Site Work

6

11

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
23
Bidding Soon
222
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2025

September 1, 2025

Project location map

2258 Blue Mesa Rd, Powderhorn, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.