Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 6, 2025 at 8:00 PM
Updated August 7, 2025
Site work for a civil project in Belcourt, North Dakota. Working plans call for site work for a water / sewer project.
As of August 6, 2025, no bid receive . No definite date for the rebid. Question Deadline 06/12/2025 Questions received less than seven days prior to the date for opening of Bids may not be answered. The Work is located in the greater Turtle Mountain region. Schedule A is located within the Shell Valley Aquifer which is near Rolette, ND. Construction activities for this schedule will take place in each of the three wellfields: Thorne, Rolette, and Shell Valley. Rolette wellfield work includes mechanical, electrical, and sitework improvements and refurbishments to the existing production well sites and control vaults; Thorne wellfield work includes investigation, testing and installation of a new production well, control vault, and harmonic filter in the booster station electrical room; Shell valley includes the installation of new control vaults, wellsite maintenance pads, and existing wellhouse electrical improvements. Schedule B work includes the purchasing and installation of water service meters into current water user's homes in the Turtle Mountain Service Area. Schedule C is located at Booster Pump Station A which includes electrical equipment installation (MCC and Control Panel), and process mechanical updates, pump furnishing, and installation, and sitework. Schedule D contains electrical updates to the existing Water Treatment Plant's electrical room (Harmonic Filters, MCC1, MCC2, Transformer, PLC Control Panel, and SCP panel). Description : The Work is located in several different parts of the Turtle Mountains. The first schedule is located on or near the three different well field sites. (Thorne, Rolette, and Shell Valley). The schedule consists of upgrades and renovations to control vaults, installation of new wells and control vaults, and drainage corrections. The second schedule is spread across multiple areas. The work includes the purchasing and installation of meters into current water users' homes. The third schedule is for the upgrades to Booster Pump Station A, which is located in the Turtle Mountains. The fourth and final schedule contains updates to the existing Water Treatment Plant.
Final Planning
Water / Sewer
$1,579,050.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 10, 2025
February 6, 2026
Multiple Locations, Belcourt, ND
Related To This Project
Belcourt, ND
Bid Date: Jun 26 2025
Belcourt, ND
Bid Date: Aug 21 2025
Belcourt, ND
Bid Date: Aug 20 2025
Belcourt, ND
Bid Date: Sep 24 2025
Belcourt, ND
Bid Date: Oct 22 2025
Belcourt, ND
--
Belcourt, ND
Bid Date: Nov 13 2025
Belcourt, ND
Bid Date: Jun 12 2025
Belcourt, ND
Bid Date: May 15 2025
Belcourt, ND
Bid Date: Apr 15 2025
Belcourt, ND
Bid Date: Apr 01 2025
Belcourt, ND
Bid Date: Apr 11 2025
Belcourt, ND
Bid Date: Mar 12 2025
Belcourt, ND
Bid Date: Jan 10 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
