BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 6, 2025 at 8:00 PM

Updated August 7, 2025

Site work for a civil project in Belcourt, North Dakota. Working plans call for site work for a water / sewer project.

As of August 6, 2025, no bid receive . No definite date for the rebid. Question Deadline 06/12/2025 Questions received less than seven days prior to the date for opening of Bids may not be answered. The Work is located in the greater Turtle Mountain region. Schedule A is located within the Shell Valley Aquifer which is near Rolette, ND. Construction activities for this schedule will take place in each of the three wellfields: Thorne, Rolette, and Shell Valley. Rolette wellfield work includes mechanical, electrical, and sitework improvements and refurbishments to the existing production well sites and control vaults; Thorne wellfield work includes investigation, testing and installation of a new production well, control vault, and harmonic filter in the booster station electrical room; Shell valley includes the installation of new control vaults, wellsite maintenance pads, and existing wellhouse electrical improvements. Schedule B work includes the purchasing and installation of water service meters into current water user's homes in the Turtle Mountain Service Area. Schedule C is located at Booster Pump Station A which includes electrical equipment installation (MCC and Control Panel), and process mechanical updates, pump furnishing, and installation, and sitework. Schedule D contains electrical updates to the existing Water Treatment Plant's electrical room (Harmonic Filters, MCC1, MCC2, Transformer, PLC Control Panel, and SCP panel). Description : The Work is located in several different parts of the Turtle Mountains. The first schedule is located on or near the three different well field sites. (Thorne, Rolette, and Shell Valley). The schedule consists of upgrades and renovations to control vaults, installation of new wells and control vaults, and drainage corrections. The second schedule is spread across multiple areas. The work includes the purchasing and installation of meters into current water users' homes. The third schedule is for the upgrades to Booster Pump Station A, which is located in the Turtle Mountains. The fourth and final schedule contains updates to the existing Water Treatment Plant.

Final Planning

Water / Sewer

$1,579,050.00

Public - Federal

Site Work

42

26

11

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
4
Bidding Soon
98
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2025

February 6, 2026

Project location map

Multiple Locations, Belcourt, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.