BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 4, 2025 at 8:00 PM

Updated August 5, 2025

Site work and paving for a mixed-use development in Algonquin, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of August 4, 2025, project was awarded to Brothers Asphalt Paving, Inc, awarded amount is $1,423,661.68** The Village of Algonquin is accepting sealed bids for the 2025 MFT Pavement Management Program which includes roadway resurfacing, curb/gutter, sidewalk, and driveway replacement. Other elements include bike path removal and resurfacing, parking lot pavement removal and resurfacing, drainage/utility lid adjustments, and all incidental and collateral work necessary to complete the project as shown on the plans and special provisions. All work must comply with Illinois Prevailing Wage laws, state labor requirements, Public Act 30 ILCS 570, and Equal Employment Opportunity laws. A 5% bid security, along with 100% performance and labor/ material bonds, is required. The Village reserves the right to accept or reject any bids. The Work is called 2025 MFT Pavement Management Program and shall consist of roadway resurfacing, curb/gutter, sidewalk, and driveway replacement. Other elements include bike path removal and resurfacing, parking lot pavement removal and resurfacing, drainage/utility lid adjustments, and all incidental and collateral work necessary to complete the project as shown on the plans and special provisions. All questions regarding this project should be directed to Dave Kleinwachter at Christopher B. Burke Engineering: Dkleinwachter@cbbel.com or 847-823-0500.. The work consists of roadway resurfacing, curb/gutter, sidewalk, and driveway replacement. Other elements include bike path removal and resurfacing, parking lot pavement removal and resurfacing, drainage/utility lid adjustments, and all incidental and collateral work necessary to complete the project as shown on the plans and special provisions

Award

Roads / Highways

$1,423,662.00

Public - City

Paving, Site Work

81

6

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
543
Active Projects
294
Bidding Soon
3,891
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2025

August 18, 2025

Project location map

Multiple Locations, Algonquin, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.