BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 2, 2025 at 8:00 PM

Updated July 3, 2025

Site work for a playground / park / athletic field in Bellevue, Michigan. Completed plans call for site work for a playground / park / athletic field.

The Village of Bellevue will accept bids to remove the current basketball courts at Jefferson Park, 509 Webster St., and install a multi-sport court The Village of Bellevue has the right to reject any and all bids. B. 1 1 LSUM B. 2 1 LSUM B. 3 1 LSUM B. 4 1 LSUM B. 5 1 LSUM B. 6 1 LSUM B. 7 1 LSUM B. 8 1 LSUM B. 9 1 LSUM B. 10 1 LSUM B. 11 1 LSUM B. 12 1 LSUM Stripe 2 Pickleball Courts, 100% Acrylic Paint Install 2 Basketball Poles & Hoops Install 6 Ground Sleeves for poles, provided by the Village Topsoil & Rake (ready for seed) around new court The Village of Bellevue has the right to reject any and all bids. Construction may begin on July 1, 2025, and must be completed by September 30, 2025. 2" MDOT 13A Base Coat SS1H Bond Coat 1.5" MDOT 36A Limestome Virgin Tennis Court Mix Stripe 1 Basketball Court, 100% Acrylic Paint Description Asphalt, removal & disposal, approx. 2 inches thick Concrete, removal & disposal, approx 4 inches thick 350 yds. Class III Fill (sand), placed & compacted 200 yds. State Certified 21AA, placed & compacted

Award

Playgrounds / Parks / Athletic Fields

$115,310.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
284
Active Projects
170
Bidding Soon
1,853
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2025

July 1, 2025

Project location map

509 N Webster St, Bellevue, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.