Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 2, 2025 at 8:00 PM
Updated August 3, 2025
Site work and paving for a civil project in Chipley, Florida. Completed plans call for site work for a water / sewer project; bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
Counties: Washington Road Name: Resurfacing Limits: 61060000 Project(s): 45080715201(*) Federal Aid No: N/A Project(s): 45080715202(*) Federal Aid No: N/A Total Roadway Length: 28.758 Miles Total Bridge Length: 0.120 Miles Total Proposal Length: 28.878 Miles Contract Days: 260 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Days Flexible Please read the full advertisement Description: The Improvements under this District Contract consist of milling and resurfacing SR 277 (Vernon Hwy) from SR 79 to SR 10 (US 90) in Washington County. Lead FPID 450807-1-52-01 includes milling and resurfacing, drainage improvements, signing and pavement markings, and bridge joint replacements on Bridge No. 610074 and Bridge No. 610073. FPID 450807-1-52-02 includes utility manhole adjustments. Pre-qualification is Required to Bid on This Project. Marine General Liability Insurance as referenced in Section 7-13.5 of the FDOT Standard Specifications may be required if any work under this Contract is performed using vessel(s). Prior to the Contract execution, Contractor shall provide written certification to the Department if no vessel(s) will be used for the work. Vessel: a watercraft or other artificial contrivance, whether motorized or non-motorized, used to perform some or all of the work, as well as any incidental work related to the project, which includes, but is not limited to, barges, dredges, mobile offshore drilling units, floating cranes, tugboats, ferries, and any watercraft used to transport construction workers, materials, or equipment at the project. Question Deadline 07/03/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 002 - Resurfacing - SR 277 (Vernon Hwy)
Award
Bridges / Tunnels
$7,243,211.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 10, 2025
September 8, 2025
FL-277, Chipley, FL
Related To This Project
Chipley, FL
Bid Date: Aug 13 2025
Chipley, FL
--
Chipley, FL
Bid Date: Aug 27 2025
Chipley, FL
Bid Date: Sep 16 2025
Chipley, FL
Bid Date: Dec 04 2025
Chipley, FL
--
Chipley, FL
Bid Date: Oct 06 2025
Chipley, FL
Bid Date: Aug 05 2025
Chipley, FL
Bid Date: Jun 19 2025
Chipley, FL
--
Chipley, FL
Bid Date: Jun 18 2025
Chipley, FL
Bid Date: May 01 2025
Chipley, FL
--
Chipley, FL
Bid Date: Apr 01 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
