Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 17, 2026 at 7:00 PM
Updated February 18, 2026
Site work for a water / sewer project in Smithfield, Rhode Island. Completed plans call for site work for a water / sewer project.
A. Project Identification: 1. Project Location: Smithfield High School, 90 Pleasant View Avenue, Smithfield, RI B. Engineer Identification: The Contract Documents, dated June 2025 were prepared for the Project by Fuss & O'Neill, Inc. C. Description of Work: 1. Work includes but is not limited to the following as indicated on the Contract Documents a. Furnishing, installing, and maintaining temporary erosion control as necessary throughout construction. b. Site clearing as required to complete the work. c. Furnishing and installing stormwater management system, including subsurface infiltration system, storm drain piping, and storm drain structures. d. Outfall improvements. e. Re-grade and restore parking lot with bituminous concrete pavement. f. Loam and seed, and all other work necessary to restore site to its preconstruction state. In accordance with Rhode Island General Law 37-14-1, bidders shall meet the established goal of not less than fifteen percent [15%] of the contract bid price be performed by Minority Business Enterprises (MBEs) or Women Businesses Enterprises (WBEs) where it has been determined that subcontract opportunities exist, and where certified MBEs/WBEs are available. Every request for such interpretations should be in writing, addressed to Bridget Zwack, WRWC, via email to bzwack@wrwc.org. Questions must be received by February 4, 2026 at 5:00 PM. Project No. SVY-2022-150 Reference Number 0000410148 The work includes, but is not limited to, erosion control measures, site clearing, storm drainage infrastructure, and site restoration at the Smithfield High School. Question Acceptance Deadline 02/04/2026 05:00 PM EST Questions are submitted online Yes Bid Security in the Form of a Certifed Check or Bond in the Amount of 10% of Such Bid is Required. The successful bidder will be required to furnish a Performance Bond and Labor and Materials Payment Bond (AIA Document A311), each in the amount of 100% of the contract price.
Post-Bid
Water / Sewer
$600,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 17, 2026
June 17, 2026
90 Pleasant View Ave, Smithfield, RI
Related To This Project
Smithfield, RI
Bid Date: Jul 30 2025
Smithfield, RI
Bid Date: Aug 26 2025
Smithfield, RI
Bid Date: Sep 03 2025
Smithfield, RI
Bid Date: Sep 03 2025
Smithfield, RI
Bid Date: Aug 15 2025
Smithfield, RI
--
Smithfield, RI
Bid Date: Oct 06 2025
Smithfield, RI
Bid Date: Oct 06 2025
Smithfield, RI
Bid Date: May 27 2025
Smithfield, RI
Bid Date: May 08 2025
Smithfield, RI
Bid Date: Mar 27 2025
Smithfield, RI
Bid Date: Apr 04 2025
Smithfield, RI
--
Smithfield, RI
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
