Site work and paving for a road / highway in Beloit, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of July 14, 2025, the project was awarded to Rock Road Companies Inc., with an awarded amount of $1,376,364.74. Approximately: Mill and Overlay 36 Blocks, Pulverize and Relay 11 Blocks and Miscellaneous Items Associated With Above Work. Bidders Proof of Responsibility Questionnaire: All Bidders Must Execute and File a Bidder's Proof of Responsibility Questionnaire No Later Than the Close of Business on seven (7) calendar days prior to the bid opening. Bid Info: All Bids shall be addressed to the City Engineer and shall be enclosed in a SEALED ENVELOPE, marked with the name and address of the Bidder, Project Title and the Contract Number for which the bid is being submitted. All bidders shall bid in accordance with, and shall bid upon the bid forms included in the Contract Documents. A certified check or satisfactory Bid Bond payable to the City of Beloit in the amount of 5% of the Bid shall accompany each bid as a guarantee, that if the bid is accepted, the bidder will execute and file the Agreement, the Contract Performance Bond and Payment Bond, as required by the Contract Documents, within ten (10) days after the Notice of Award of the Contract by the City of Beloit. Failure of the part of the Bidder to do so will result in forfeiture of the Bidder's certified check or Bid Bond to the City of Beloit as liquidated damages. The Bidder to whom a Contract is awarded shall be required to furnish both a Performance Bond and a Payment Bond acceptable to the City of Beloit for 110% of the Contract Price for each of the above Bonds, in accordance with the requirement of the Contract Documents. Pre-Qualification: Yes Est. Completion Date: Oct. 3, 2025 The City of Beloit reserves the right to reject any and all bids, waive any informalities in bidding, or to accept the bid or bids, which best serve the interests of the City of Beloit. No bid shall be withdrawn for a period of sixty (60) days after the scheduled opening of the bids without the consent of the City of Beloit. Question Deadline 06/19/2025 Bidders Proof of Responsibility Questionnaire: All Bidders Must Execute and File a Bidder's Proof of Responsibility Questionnaire No Later Than the Close of Business on seven (7) calendar days prior to the bid opening. Contractor Staking, Full Depth Saw Cutting, Remove Curb & Gutter, Concrete Curb & Gutter 30-Inch Type L, Remove Asphalt Pavement, Remove Concrete Sidewalk/Driveway, Concrete Sidewalk 4-Inch (includes dense base aggregate- 1~1/4" crushed limestone), Concrete Driveway Approach 6-Inch (includes dense base aggregate- 1~1/4" crushed limestone), Curb Ramp Detectable Warning Fields (Truncated Domes), Concrete Surface Milling (Including Butt Joints at Driveways), Asphaltic Surface Milling (Includes Butt Joints at Driveways), HMA Pavement, 3 LT 58-28 S (Base Course), HMA Pavement, 5 LT 58-28 S (Surface Course),3" Select Crushed (EBS if needed), Supply and install Neenah R-1710 MH Casting, with locking, nonrocking, type B lid, with up to 12" of new adjusting rings

Award

Roads / Highways

$1,376,365.00

Public - City

Paving, Site Work

63

7

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
567
Active Projects
220
Bidding Soon
3,790
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2025

July 28, 2025

Project location map

Multiple Locations, Beloit, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.