Published September 4, 2025 at 8:00 PM
Updated September 5, 2025
Site work and paving for a mixed-use development in Beloit, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
As of September 04, 2025, the project was awarded to Rock Road Companies Inc., with an awarded amount of $689,811.02. Reconstruction. The work for which bids are asked includes the following: APPROXIMATELY: 5,250 SY PAVEMENT REMOVAL, 1,100 SY CONCRETE PAVEMETN REMOVAL, 1,500 SY SIDEWALK AND DRIVEWAY REMOVAL, 1,900 LF OF CURB AND GUTTER REMOVAL, 2,300 CY OF COMMON EXCAVATION, 3,500 TON OF AGGREGATE, 1,400 TONS OF HMA PAVEMENT, 5,550 LF OF CURB AND GUTTER, 760 SY OF CONCRETE SIDEWALK AND DRIVEWAY, 1450 LF OF ROAD PAINT, 2 EA STORM INLET, 30 LF OF 12-INCH RCP STORM SEWER, AND MISCELLANEOUS ITEMS ASSOCIATED WITH ABOVE WORK. BID SECURITY: A certified check or satisfactory Bid Bond payable to the City of Beloit in the amount of 5% of the Bid shall accompany each bid as a guarantee, that if the bid is accepted, the bidder will execute and file the Agreement, the Contract Performance Bond and Payment Bond, as required by the Contract Documents, within ten (10) days after the Notice of Award of the Contract by the City of Beloit. Failure of the part of the Bidder to do so will result in forfeiture of the Bidder's certified check or Bid Bond to the City of Beloit as liquidated damages. CONTRACT SECURITY: The Bidder to whom a Contract is awarded shall be required to furnish both a Performance Bond and a Payment Bond acceptable to the City of Beloit for 110% of the Contract Price for each of the above Bonds, in accordance with the requirement of the Contract Documents. BID REJECTION: The City of Beloit reserves the right to reject any and all bids, waive any informalities in bidding, or to accept the bid or bids, which best serve the interests of the City of Beloit. BID WITHDRAWAL: No bid shall be withdrawn for a period of sixty (60) days after the scheduled opening of the bids without the consent of the City of Beloit. All Bidders must execute and file a Bidder's Proof of Responsibility Questionnaire no later than the close of business on Wednesday, July 16 which is seven (7) calendar days prior to the bid opening.
Award
Roads / Highways
$689,811.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 23, 2025
September 8, 2025
5th St, Beloit, WI
Related To This Project
Beloit, WI
Bid Date: Jul 24 2025
Beloit, WI
Bid Date: Jul 23 2025
Beloit, WI
Bid Date: Jul 30 2025
Beloit, WI
Bid Date: Sep 30 2025
Beloit, WI
Bid Date: Oct 09 2025
Beloit, WI
Bid Date: Dec 01 2025
Beloit, WI
Bid Date: Jul 10 2025
Beloit, WI
Bid Date: Jul 02 2025
Beloit, WI
Bid Date: Jun 26 2025
Beloit, WI
Bid Date: Jun 26 2025
Beloit, WI
Bid Date: May 29 2025
Beloit, WI
Bid Date: May 09 2025
Beloit, WI
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.