BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2025 at 8:00 PM

Updated August 13, 2025

Demolition and remodeling of a municipal facility in Des Moines, Iowa. Completed plans call for the remodel of a municipal facility; and for the demolition of a municipal facility.

As of August 12, 2025, 7/30/2025 was the notice to proceed date Description: A. The work includes, but is not necessarily limited to: 1. Electrical work consisting of furnishing and installing a total of six (6) new on-grade floor box outlets, four (4) in the Board Room and two (2) in the Planning Conference Room. Furnishing and installing raceways from the floor boxes to the accessible wall areas and to the ceiling for connection to existing races. Raceways will include conduits placed in concrete. Electrical work includes furnishing and installing dedicated circuits to each floor box to the nearest panel, strings in conduit for data cabling, six (6) combination data outlets and six (6) power outlets behind the proposed six (6) TV monitors (by others) with the remaining one (1) power outlet located on the north proposed wall, wiring for the power to the receptacles at the monitors, data rough-in for proposed TV monitors (by others) and cameras (by others), demolition and removal of one(1) existing floor box, and demolition and replacement for electrical in interior walls that will be removed or relocated as part of the project. 2. Masonry/flooring and Carpentry work consists of sawing and removing existing floor to provide channels for the electrical work, placement of concrete around conduit, mud slabs under floor boxes, pouring the floor back flush with the existing concrete slab for future permanent carpet installation (by others), demolition and removal of moving partition walls, demolition and removal of walls and doors, installation of plywood backer boards for the proposed six (6) TV monitors (by others) and framing and building out proposed walls for additional storage spaces. 3. See the Detailed Construction Drawings for Additional Information and Requirements.

Award

Municipal

$65,338.00

Public - City

Demolition, Remodeling

20

24

6

6

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
102
Bidding Soon
1,119
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2025

July 28, 2025

Project location map

2201 George Flagg Pkwy, Des Moines, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.