BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2025 at 8:00 PM

Updated July 4, 2025

Renovation of an educational facility in Winnipeg, Manitoba. Completed plans call for the renovation of a educational facility.

Project Summary: Addition of two (2) new rooftop exhaust fans. Modification to existing Gym Air Handling Unit including new motors and VFD's, as well as new motorized dampers within ductwork to facilitate new exhaust sequences. Replacement and installation of electrical and controls as required. Substantial Performance of the Work is required for Owner use before the 1st day, of the September, in the year 2025. Bid bond in the amount of not less than ten (10)% of the bid price. Provide a Performance Bond in the name of the Owner for 50% of the Contract Price, to assure the faithful performance of the Contract Provide a Labour and Material Payment Bond in the name of the Owner for 50% of the Contract Price, to assume faithful payment of monies to parties in contract with the Contract; on Labour and Material Payment Bond Question Acceptance Deadline: 2025/06/23 02:00:00 PM CDT Direct questions to Prime Consultant Location 2055 Notre Dame Avenue, Winnipeg, MB The Consultant will issue each Addendum at least three (3) Working Days prior to the Submission Deadline, or will, if required, issue an Addenda to extend the Submission Deadline to provide for at least three (3) Working Days between the issuing of an Addendum and the Submission Deadline. Attendance Mandatory Location 2055 Notre Dame Avenue, Winnipeg, MB Docs can be obtained from https://www.merx.com/mbgov/solicitations/open-bids/Red-River-College-Polytech-North-Gym-Ventilation/0000295902

Post-Bid

Educational

$300,000.00

Public - State/Provincial

Renovation

17

14

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
42
Bidding Soon
544
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2025

August 4, 2025

Project location map

2055 Notre Dame Ave, Winnipeg, MB


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.