Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 16, 2025 at 8:00 PM
Updated July 17, 2025
Site work for a bridge / tunnel in Minot, North Dakota. Completed plans call for site work for a bridge / tunnel.
**As of July 16, 2025, the project was awarded to Wagner Construction, with an awarded amount of $257,151.25** The Remove, Relay, Extend 84" RCP & Installation of one 60" RCP in Burt Township on 86 Street SW, Minot, ND located 9 miles Southwest of Minot, ND, near the intersection of the 79th Avenue SW and 86th Street SW. The work consists of the following approximate quantities: Common Excavation - Type A = 1 LS; Riprap Grade II = 200 Ton; Borrow-Excavation = 2650 CY; Pipe Bedding CL-3 or CL-5 = 275 Ton; 60 in RCP Class III = 104 LF; and 60 in RCP End Section = 2 EA. 84 in RCP Class III = 32 LF; REMOVE & RELAY Pipe 84 in = 24 LF; and 84 in RCP End Section = 2 EA. Est. Completion Date: Nov. 1, 2025 Site Directions: 7 miles West and 3 miles south of Minot ND, located in the SW corner of Section 13-154-84 Burt Township.
Award
Bridges / Tunnels
$257,151.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 30, 2025
July 30, 2025
7900 86th St SW, Minot, ND
Related To This Project
Minot, ND
Bid Date: Jul 09 2025
Minot, ND
Bid Date: Aug 07 2025
Minot, ND
Bid Date: Aug 07 2025
Minot, ND
Bid Date: Aug 15 2025
Minot, ND
Bid Date: Jul 29 2025
Minot, ND
Bid Date: Jul 17 2025
Minot, ND
Bid Date: Aug 08 2025
Minot, ND
Bid Date: Aug 26 2025
Minot, ND
Bid Date: Jun 24 2025
Minot, ND
Bid Date: Jun 23 2025
Minot, ND
Bid Date: Jun 05 2025
Minot, ND
Bid Date: May 30 2025
Minot, ND
Bid Date: Mar 03 2026
Minot, ND
--
Minot, ND
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
