BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2025 at 8:00 PM

Updated August 19, 2025

Site work and paving for a mixed-use development in Blanchardville, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

In general, the work consists of: repaving several roadways and parking lots within Yellowstone Lake State Park. This project will also reconstruct failing retaining walls and campsite pads, along with replacement of existing roadway drainage structures. The project will also address the failing culvert pipes located at the Bridgeport Boat Landing. No in-person pre-bid tour will be offered. Bidders are welcome to visit the site to walk the exterior to see conditions during daylight hours, when the park is open. Pre-bid questions may be directed to Travis Brush, KL Engineering at travis.brush@klengineering.com. Base Bid will be received for: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Bid date description: Hand delivery to the drop box labeled SEALED BIDS ONLY in front of the State of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 53703.

Award

Roads / Highways

$1,028,863.00

Public - State/Provincial

Paving, Site Work

60

12

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
134
Bidding Soon
1,074
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2025

July 31, 2025

Project location map

8495 N Lake Rd, Blanchardville, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.