BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2025 at 8:00 PM

Updated August 13, 2025

Site work and new construction of a pre-engineered storage facility in Westerly, Rhode Island. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Reference Number 0000390650 Question Deadline 07/01/2025 at 12:00 PM ET Questions are submitted online No, Questions regarding this solicitation must be emailed and received by the Purchasing Dept. at ecardillo@westerlyri.gov no later than time, in a Microsoft Word attachment with the corresponding solicitation number. Bid Intent Not Available Bidder shall base the Proposal on providing all materials and equipment, FOB jobsite. Bid Price which exceed $50,000 must include a 5% Bid Bond and cost of Payment and Performance Bonds. The successful Bidder will be required to post a 100% Payment and Performance Bond. Offers are irrevocable for one hundred twenty (120) days from the opening date (or such other extended period set forth in the solicitation), and may not be withdrawn, except with the express permission of the Purchasing Agent. The Contractor will be responsible for the completion of the following work scope items: SPECIAL CONSTRUCTION 13120 PART 1 -- GENERAL 1.1 1.2 WORK A. Provide the Town of Westerly: Pre-Engineered I-Beam Metal Building. 1. Refer to schematic drawings provided for a graphic representation of what is being proposed. 2. A foundation will be designed (by others) once the loading and engineering data is provided. 3. Refer to the Organization Chart for individual trades contracted directly by the Town of Westerly. B. Provide everything required to complete the work as shown on the Drawings and specified herein. C. Refer to the attached 'Organization Chart' for a breakdown of responsibilities by each referenced party. QUALITY STANDARDS A. Provide experienced, well-trained workers competent to complete the work as specified. B. Unless approved by the Architect, provide all related products and accessories from one manufacturer. C. Use products and accessories from a manufacturer who specializes in making, installing, and servicing systems of this type as specified or approved by the Architect. D. All work shall comply with manufacturers' instructions and governing building and safety codes (IBC, Fire, Energy, etc.).

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$314,306.00

Public - City

New Construction, Site Work

3

3

2

4

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
551
Active Projects
223
Bidding Soon
3,903
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2025

August 8, 2025

Project location map

35 Larry Hirsch Ln, Westerly, RI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.