Published July 30, 2025 at 8:00 PM

Updated July 31, 2025

Site work, paving and outdoor lighting for a mixed-use development in White Bear Lake, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a sidewalk / parking lot.

Contract Quantities Include the Following: 8,900 S.y. Remove Bituminous Pavement 3,300 L.f. Remove Curb and Gutter 14,700 S.f. Remove Concrete Sidewalk 7 Each Clear & Grub 3,400 L.f. Concrete Curb and Gutter Design B618 15,000 S.f. Concrete Walk 1,800 Ton Bituminous Wearing Course 14 Each Storm Sewer Structures 680 L.f. Storm Sewer Pipe 3 Each Electrical Service Cabinet 19 Each Light Poles & Bases 1,900 L.f. Non-metallic Conduit 12,000 L.f. Underground Wire 10 Each Deciduous Tree an Exclusive Electronic Bidding Process is Being Used for This Project. A Bid Bond for Five (5%) Percent of the Amount of the Bid is Required to Submit a Vbid at online. The Bid Bond Will Be Forfeited as Liquidated Damages if the Bid is Accepted and the Bidder Fails to Promptly Provide the Required Additional Documents or Enter Into the Contract. The Successful Bidder Must Be a "responsible Contractor." the Term "responsible Contractor" Means a Contractor as Defined in Minnesota Statutes, Section 16c.285, Subdivision 3. Any Prime Contractor, Subcontractor, or Motor Carrier That Does Not Meet the Minimum Criteria or Fails to Comply With the Verification Requirements is Not a Responsible Contractor and is Not Eligible to Be Awarded a Construction Contract for the Project or to Perform Work on the Project. A Prime Contractor, Subcontractor, or Motor Carrier That Makes a False Statement Under Oath Verifying Compliance With the Minimum Criteria Will Be Ineligible to Be Awarded a Construction Contract on the Project, and the Submission of a False Statement May Result in Termination of a Contract Awarded to a Prime Contractor, Subcontractor, or Motor Carrier That Submits the False Statement. A Prime Contractor Shall Include in Its Verification of Compliance a List of All of Its First-tier Subcontractors That It Intends to Retain for Work on the Project. Before Execution of a Construction Contract, a Prime Contractor Shall Submit a Supplemental Verification Under Oath Confirming That All Subcontractors and Motor Carriers That the Prime Contractor Intends to Use to Perform Project Work Have Verified to the Prime Contractor, Through a Signed Statement Under Oath by an Owner or Officer, That They Meet the Minimum Criteria for a Responsible Contractor. The City Council Reserves the Right to Reject Any and All Bids, to Waive Irregularities and Informalities Therein, and to Award the Contract in the Best Interest of the City. Bids Submitted After the Deadline Will Be Rejected. No Bidder May Withdraw Its Bid Within Sixty (60) Days After the Scheduled Closing Time for the Receipt of Bids. Question Deadline 06/27/2025 All questions about the meaning or intent of the Contract Documents are to be directed to Engineer.

Award

Sidewalks / Parking Lot

$1,293,441.00

Public - City

Outdoor Lighting, Paving, Site Work

53

26

6

5

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
325
Active Projects
169
Bidding Soon
1,650
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2025

August 4, 2025

Project location map

Multiple Locations, White Bear Lake, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.