Published November 19, 2025 at 7:00 PM
Updated November 20, 2025
Renovation of a mixed-use development in Winnipeg, Manitoba. Completed plans call for the renovation of a educational facility.
SCOPE OF WORK 1. Supply all materials, plant and labour required to complete the ceiling upgrades at various schools as indicated. 2 Furniture and equipment removal by Owner. 3. Remove and reinstall existing light fixtures where indicated or as required for install of new ceiling 4. Supply new light fixtures where indicated. 5 Contractor to neatly cut all existing devices to remain in new ceilings tiles. If removal and reinstallation is necessary, work should be done by a qualified trade. 6. Contractor shall allow for any and all verification costs. Adjustments to any fire alarm system devices, of any kind, must be done by a qualified trade and the Contractor shall allow for all verification costs. 7. Work includes but is not restricted to: Item 01A George Waters Middle School, 190 Ferry Rd. Room 8-Install new ceiling tiles, grid, and light fixtures as per attached specifications and drawings A1. (Approx. 725 sq. ft.) Item 018-George Waters Middle School, 190 Ferry Rd. Room 9-Install new ceiling tiles, grid, and light fixtures as per attached specifications and drawings A1-A2 (Approx. 793 sq. ft.). Item 02A-Hedges Middle School, 369 Fairlane Ave. Hallway H1-Remove and replace 24" x 48 ceiling tiles and paint existing grid as per attached specifications and drawing A3, A5 (Approx. 398 sq. ft.). Item 028-Hedges Middle School, 369 Fairlane Ave. Hallway H4-Remove and replace 24" x 48' ceiling tiles and paint existing grid as per attached specifications and drawing A3-A5 (Approx. 1288 sq. ft.) Item 02C-Hedges Middle School. 369 Fairlane Ave. Hallway H5-Remove and replace 24" x 48 ceiling tiles and paint existing grid as per attached specifications and drawing A3-A5 (Approx. 1282 sq. ft.) Item 020-Hedges Middle School, 369 Fairlane Ave Room G3 - Remove existing 12" x 12" ceiling tiles and light fixtures. Install new celling tiles, grid, and light fixtures as per attached specifications and drawings A3-A5. (Approx. 87 sq. ft.). Item 02E-Hedges Middle School, 369 Fairlane Ave. Hallway 158 - Remove existing 12" x 12" ceiling tiles and light fixtures. Install new ceiling tiles, grid, and light fixtures as per attached specifications and drawings A5. (Approx. 245 sq. ft.). Item 03A Jameswood Alternative School, 1 Braintree Cres. Room 216-Remove and replace 24" x 48" ceiling tiles and paint existing grid as per attached specifications and drawing A6 (Approx. 804 sq. ft.). Item 03B Jameswood Alternative School, 1 Braintree Cres. Room 217-Remove and replace 24" x 48" ceiling tiles and paint existing grid as per attached specifications and drawing A6 (Approx. 800 sq. ft.). Item 04A-Ecole Voyageur, 37 Voyageur Ave. Room 14-Install new ceiling tiles, grid, and light fixtures as per attached specifications and drawings A7. (Approx. 777 sq. ft.). Item 05A-Westwood Collegiate, 360 Rouge Rd. Room 104-Install new ceiling tiles, grid, and light fixtures as per attached specifications and drawings A8. (Approx. 1736 sq. ft.). The Bidder shall examine the project sites before submitting a Bid and shall be satisfied as to the nature and location of the Work, means of access to the place of work, location of all obstructions and utilities affecting the Work and shall cover the cost of all items included in the Bid documents The Bidder shall contact the Head Caretaker of the school prior to inspection. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Award
Educational
$111,140.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 11, 2025
August 11, 2025
Multiple Locations, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Jul 10 2025
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Jul 14 2025
Winnipeg, MB
Bid Date: Jul 16 2025
Winnipeg, MB
Bid Date: Jul 15 2025
Winnipeg, MB
Bid Date: Jul 11 2025
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Jul 09 2025
Winnipeg, MB
Bid Date: Jul 25 2025
Winnipeg, MB
Bid Date: Jul 02 2025
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Jun 26 2025
Winnipeg, MB
Bid Date: Jul 04 2025
Winnipeg, MB
Bid Date: Jun 27 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.