Published July 1, 2025 at 8:00 PM

Updated July 2, 2025

Site work for a water / sewer project in Boulder City, Nevada. Completed plans call for site work for a water / sewer project.

LAKE 254108, Callville Bay Barge Relocation a) This acquisition is being conducted via Small Business set-aside. The North American Industrial Classification System (NAICS) code and the associated small business size standard are noted in clause 52.204-8 in section "K" of this solicitation. b) Magnitude of Construction: Between $5,000,000 and $10,000,000 (note the magnitude of construction range per the allowable ranges in FAR 36.204.) c) Refer to section "L" for information regarding a pre-proposal site visit. d) Information and requirements stated in sections "B" through "J" & attachments noted in section "J" apply to this solicitation and the subsequent contract. e) Refer to section "L" for proposal submittal requirements. f) Offerors shall submit proposals and questions, and acknowledge solicitation This project will relocate and replace the Callville Bay water intake barge system to allow for drinking water production to a Lake Mead elevation of 950' above sea level and negate further intermediate and costly barge movements. The current location of the water intake barge at Callville Bay can provide drinking water to a Lake Mead elevation of 1075'. Completing this barge relocation will involve the rerouting and extension of existing raw water transmission lines, construction of a moored breakwater, replacement of electrical transformer by a 3rd party power provider, replacement of existing standby generator with new appropriately positioned generator, as well as the extension and up-sizing of existing electrical lines. Enhance existing service road to access new system equipment (generator, UV treatment unit). Removal/demolition of existing barge, pumps and motors and associated controls and replacement with a new barge, pumps, controls system. Installation of a UV raw water treatment system to counter the Quagga mussel infestation of Lake Mead. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Please submit all questions not later than 5/13/25.

Post-Bid

Water / Sewer

$10,000,000.00

Public - Federal

Site Work

65

25

145

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
35
Bidding Soon
347
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2025

August 29, 2025

Project location map

To Be Determined, Boulder City, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.