Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 18, 2025 at 8:00 PM
Updated August 19, 2025
Site work for a water / sewer project in Boulder City, Nevada. Completed plans call for site work for a water / sewer project.
Question Deadline 07/04/2025 at 10:00 AM PT Questions regarding this bid must be directed to the Bid Contact listed in this Bid The proposed Work is generally described as follows The Site of the Work is located at Chlorine Building 1, on the Alfred Merritt Smith Water Treatment Facility Site; 243 Lakeshore Rd., Boulder City, Nevada 89005. The work consists of demolition of existing chlorine gas piping and equipment located in truck bays 1-6. Installation of owner provided chlorine evaporators and vacuum regulators in bays 3, 4 and 1. Installation of conduit, wire for electrical outlets located in bays 3, 4 and 1. The Owner requires the Project commence within 30 consecutive Calendar Days after the effective date of the Final Notice to Proceed and the Project be completed within 150 consecutive Calendar Days after the effective date of the Limited Notice to Proceed. The Work is a Public Works Project as defined by Chapter 338 of the Nevada Revised Statutes (NRS) and all Bidders are required to comply with, and the Contract shall be awarded and administered in accordance with, the laws contained in that chapter. COMMITMENT NO. 012786 Southern Nevada Water Authority invites qualified firms (Bidders) to submit Bids for the following Work, see Contract Documents for full details: The Site of the Work is located at Chlorine Building 1, on the Alfred Merritt Smith Water Treatment Facility Site; 243 Lakeshore Rd., Boulder City, Nevada 89005. The work consists of demolition of existing chlorine gas piping and equipment located in truck bays 1-6. Installation of owner provided chlorine evaporators and vacuum regulators in bays 3, 4 and 1. Installation of conduit, wire for electrical outlets located in bays 3, 4 and 1. Questions regarding this bid must be directed to the Bid Contact listed in this Bid. Question Deadline 07/04/2025 at 10:00 AM PT
Award
Water / Sewer
$728,382.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 9, 2025
August 8, 2025
243 Lakeshore Rd, Boulder City, NV
Related To This Project
Boulder City, NV
Bid Date: Jun 30 2025
Boulder City, NV
Bid Date: Aug 22 2025
Boulder City, NV
--
Boulder City, NV
Bid Date: Aug 15 2019
Boulder City, NV
Bid Date: Aug 12 2025
Boulder City, NV
Bid Date: Aug 21 2025
Boulder City, NV
Bid Date: Sep 09 2025
Boulder City, NV
Bid Date: Aug 12 2025
Boulder City, NV
Bid Date: Jul 02 2025
Boulder City, NV
Bid Date: Jul 03 2025
Boulder City, NV
Bid Date: Jul 08 2025
Boulder City, NV
Bid Date: Jul 24 2025
Boulder City, NV
Bid Date: Jun 12 2025
Boulder City, NV
Bid Date: May 28 2025
Boulder City, NV
Bid Date: Apr 30 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
