BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 30, 2025 at 8:00 PM

Updated August 1, 2025

Site work and paving for a sidewalk / parking lot in Sun Prairie, Wisconsin. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of June 30, 2025, no bid receive . The proejct is expected to rebid in 2026rebid. Bike wayfinding signs and pavement markings. Est. Completion Date: Oct. 31, 2025 All questions about the meaning or intent of the Contract Documents are to be directed to the Engineer. Interpretations or clarifications considered necessary by the Engineer in response to such questions will be issued by Addenda and forwarded to all parties recorded by the Engineer as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by formal written Addenda will be binding. 6.2 All requests for interpretation must be received at least five days prior to the date fixed for the opening of Bids. Addenda will be mailed no later than three days prior to the date fixed for the opening of Bids. Failure of any Bidder to receive any such Addendum or interpretation shall not relieve such Bidder from any obligations under his Bid assubmitted. All Addenda so issued shall become part of the Contract Documents. 6.3 Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 6.4 Addenda may also be issued to modify the Bidding Documents as deemed advisable by the City or the Engineer. Bids are invited upon the following approximate quantities of work: 1. 145 each installation of signpost with bicycle wayfinding signage a. 145 each 12' 12-gauge .105" wall thickness, 2" x 2" galvanized steel square post b. 145 each 2.25" x 2/25" x 36" ancho, full punch, galvanized c. 145 each 18" sleeve, for 21/2" x 21/s" post d. 968 each one-way bolt, 5/15" x 2" e. 968 each nut, 5/16", Coarse thread f. 968 each nylon washers, 1.5" OD x 3/8" ID, 1/16" thick g. 242 each Sun Prairie logo and bike route top sign 24"w x 18"h multicolor h. 242 each finger board 24"w x 6"h, one color 2. 77 each painted shared lane arrow markings (Double Chevron and Bicycle Symbol) 3. 1,135 LF of painted 18" by 10' at 18" gap white epoxy crosswalks 4. 82,000 lf (6900 each) of painted shared use path center line 4" wide by 3' long with 9' gap.

Final Planning

Sidewalks / Parking Lot

$170,000.00

Public - City

Paving, Site Work

100

11

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
324
Active Projects
119
Bidding Soon
1,923
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2025

February 13, 2026

Project location map

300 E Main St, Sun Prairie, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.