BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 2, 2025 at 8:00 PM

Updated July 19, 2025

Renovation of a municipal facility in Bridgeport, Washington. Completed plans call for the renovation of a municipal facility.

Colville Tribes Resident Fish Hatchery Motor Control Center Upgrade. The Confederated Tribes of the Colville Reservation seeks proposals from qualified general contractors to provide and install a Motor Control Center (MCC) upgrade at the Colville Resident Fish Hatchery (Hatchery). The hatchery is located at 79 Tribal Hatchery Road, Bridgeport, Washington. The new MCC will replace two existing MCC's and also include a new automatic transfer switch, a new panel board, a new step down transformer, and junction enclosures to splice the existing wires. Question Deadline 07/03/2025 at 5:30 PM PT All Question must be must be emailed to jill.phillips@colvilletribes.com. All responses will be posted on the website on July 8, 2025 5:30 p.m. Any contract negotiated in response to this RFP will require either a 25% retainage or a performance bond. The Tribes reserves the right to request any respondent to clarify its proposal or to supply any additional material deemed necessary to assist in the evaluation of the proposal. The Tribes reserves the right to change the RFP schedule or issue amendments to the RFP at any time. The Tribes also reserves the right to cancel or reissue the RFP. All such addenda will become part of the RFP. It is the Contractor's responsibility to check the Tribes' website for the issuance of any amendments prior to submitting a proposal response. Provided notification is received in writing to the address provided in Section 1.05, proposals may be withdrawn at any time prior to the proposal response due date and time specified. Proposals cannot be changed or withdrawn after the time designated for receipt. The Tribes reserves the right to reject any or all proposals, to waive any minor informalities or irregularities contained in any proposal, and to accept any proposal deemed to be in the best interest of the Tribes. Submission of a proposal will signify the Contractor's agreement that its proposal and the content thereof are valid for 30 days following the proposal response deadline unless otherwise agreed to in writing by both parties. The proposal may become part of the Contract negotiated between the Colville Tribes and the successful Contractor. The Tribes anticipates the service period for this work to be from a signed contract through November 30, 2026.

Post-Bid

Municipal

$80,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2025

August 18, 2025

Project location map

79 Tribal Hatchery Road, Bridgeport, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.