BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 26, 2025 at 8:00 PM

Updated April 8, 2025

This is a service / maintenance or supply contract in Bridgeport, Washington. Contact the soliciting agency for additional information.

PURCHASE DESCRIPTION All-in-one Oil Skimmer and Day Tank Replacement: DESCRIPTION OF WORK: The vendor shall provide a complete oil skimmer system which meets the specifications listed below. All components shall be new, and the skimmer system shall be shipped to the US Army Corps of Engineers at Chief Joseph Dam in Bridgeport, WA 98813. SPECIFICATIONS: Vertical tube type skimmer with integrated decanter and collection tank. The collection tank shall be stainless steel. Collection tank shall have a capacity between 65 (minimum) and 100 (maximum) gallons. The skimmer must automatically transfer recovered oil to collection tank. The collection tank must have a float switch which automatically shuts off the oil skimmer when full. The skimmer must have both an audible annunciation and indicator lamps in the event the skimmer shuts down or loses power. The collection tank must have liquid level indicator lamps to signal when the unit is 3/4 full and when full. The collection tank must have both an indicator lamp and audible alarm when full. The collection tank must have a manually activated electric pump for transferring oil and water to "used oil" drums once the collection tank is full. The skimmer must automatically return the water separated from the oil to the sump. The skimmer must use a free-floating closed loop oil collector tube to recover oil from the water surface. The oil collector tube must operate without requiring any mounts or guides installed in sump. The skimmer system must be capable of recovering 65 - 100 gallons/hour. The skimmer with integrated decanter and collection tank shall be mounted on a skid (as an all-in-one oil skimmer system). The skid shall have holes for mounting to a concrete floor or base (stationary installation). All components of the skimmer system must be designed to operate continuously (24/7). The skimmer and collector tube must recover oil from a sump with fluctuating water levels (The normal operating level for the sump is 15 to 35 feet from the finished floor). The collector tube must extend 35 feet from the finished floor into a drainage sump. The required overall length for the collector tube is estimated at 78 feet based on the old skimmer (will need to work with vendor to determine optimum length based on final installation). The collector tube must be resistant to tangling up on itself while floating on water surface. The collector tube must operate within the existing sump opening (30 inches center to center). The entire skid mounted skimmer system must fit within the existing skimmer system footprint of 30 inches x 74 inches. The power requirement is 120 VAC single phase. The skimmer system shall have a NEMA control box to house components for power, timers, lights, level switches, etc. All local alarms and indicator lamps must allow duplication to a remote annunciation panel. DELIVERY: The complete all-in-one skimmer system shall be delivered to: US Army Corps of Engineers Chief Joseph Dam Warehouse Highway 17 & Pearl Hill Road Bridgeport, WA 98813 SEE ATTACHED SOLICITATION AND TECHNICAL DRAWINGS (W912DW25R0024) Please submit questions regarding this solicitation no later than 07 April 2025, 1100 PST

Post-Bid

Water / Sewer

Public - Federal

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2025

May 7, 2025

Project location map

Highway 17 & Pearl Hill Road, Bridgeport, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.