Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 12, 2026 at 7:00 PM
Updated February 13, 2026
Site work for a bridge / tunnel in Bridgeport, Washington. Conceptual plans call for site work for a bridge / tunnel.
The Confederated Tribes of the Colville Reservation (Colville Tribes) seeks proposals from qualified entities ("Firms or Offerors") with experience in design of finfish hatchery facilities. The project site is on the Colville Indian Reservation, at the Colville Tribes' Chief Joseph Hatchery (Hatchery) . The Colville Tribes is requesting proposals including engineering design, specification, and engineer's construction cost estimates toward expanding the hatchery's current infrastructure to include the acquisition and delivery of the Relief Tunnel/Third Water Source (3WS) water at Chief Joseph Dam to the hatchery head-box as originally designed, but deferred during original construction of CJH, and to the adult holding ponds (will require feasibility assessment and design/specifications outside of the original Chief Joseph Hatchery (CJH) design. The services provided must meet requirements as described herein. Question Deadline 02/18/2026 Requests for interpretation/clarification of this RFP must be emailed to matthew.mcdaniel.fnw@colvilletribes.com. All responses will be posted on the Tribes' web site at: online no later than 4:00 p.m.PST on February 25, 2026. The Tribes reserves the right to reject any or all proposals, to waive any minor informalities or irregularities contained in any proposal, and to accept any proposal deemed to be in the best interest of the Tribes. RFP date notes: For hard copy submissions, Contractors/Offerors must submit 1 original and 3 bound copies of the proposal no more than 30 pages long, single-spaced, in a font no smaller than 12 point. Proposals shall be submitted in a sealed envelope that has clear markings of the responding business name and address and clearly identifies the contents as "Engineering Design and specifications for CJH Relief Tunnel Water Source RFP". Proposals may be sent by electronic mail, regular, or express mail (FedEx or UPS). All proposa and accompanying documentation will become the property of the Tribes and will not be returned. The method of Contractor Selection has not been Determined at this time. "Requests for proposals for design services is underway."
Conceptual
Bridges / Tunnels
$500,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
38 Half Sun Way, Bridgeport, WA
Related To This Project
Bridgeport, WA
Bid Date: Sep 16 2025
Bridgeport, WA
Bid Date: Aug 27 2025
Bridgeport, WA
Bid Date: Jul 18 2025
Bridgeport, WA
Bid Date: Jul 10 2025
Bridgeport, WA
Bid Date: May 20 2025
Bridgeport, WA
Bid Date: Apr 07 2025
Bridgeport, WA
Bid Date: Mar 18 2025
Bridgeport, WA
Bid Date: Aug 18 2025
Bridgeport, WA
Bid Date: Sep 13 2024
Bridgeport, WA
Bid Date: Aug 08 2024
Bridgeport, WA
--
Bridgeport, WA
Bid Date: May 21 2024
Bridgeport, WA
Bid Date: May 10 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
