BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2025 at 8:00 PM

Updated July 24, 2025

Site work for a water / sewer project in Richmond Township, Missouri. Completed plans call for site work for a water / sewer project.

D.C. Rogers Lake Outfall Replacement Questions should be directed tojbensman @mecoengineering.com.The owner reserves the right to waive any informalitiesor to reject any or all bids. Each bidder must deposit withhis bid security in the amount, form and subject to theconditions provided in the Information for Bidders. Attention of bidders is particularly called to therequirements as to conditions of employment to be observedand Davis Bacon and/or State Prevailing wage rates to bepaid under the contract, Segregated Facility, Section 109,and E.O. 11246.MBE, WBE and Section 3-DBE bidders are encouraged to bid No bidder may withdraw his bid within 90 days afterthe actual date of the opening thereof A. The extent of each type of joint sealer is indicated on the drawings. B. The required applications include, but are not necessarily limited to, the following: Sidewalk and slab joints. Miscellaneous concrete construction joints. Floor joints. Slab and deck joints. Equipment and isolation joints. Gasketing for assembly of components. The extent of this section shall coverall site clearing performed priorto or during any part of construction, and all final clearing necessary to insure proper drainage and prevent unsightly or unsafe conditions. The work shall include, but not be limited to, the following: 1. Protection of existing trees designated to remain. 2. Clearing and grubbing. 3. Removal of existing fence. 4. Removal of all unsuitable material from public and private property resulting from construction operations. Trenching Backfill, Compaction and Grading All Related Items The contractor shall provide sediment and erosion controls for all exposed areas within the project limits, throughout the duration of the contract, including any warranty periods. These controls shall include temporary erosion control, temporary sediment control, and final erosion control. Applicable sections: 312300 Excavating, Filling and Grading; 329000 Fertilizing Seeding and Mulching

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

9

11

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
71
Bidding Soon
543
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2025

September 8, 2025

Project location map

Co Rd 205, Richmond Township, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.