BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 6, 2025 at 8:00 PM

Updated August 7, 2025

Site work and paving for a road / highway in Folkston, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work to be performed consists of furnishing all labor and materials to complete the Folkston 2024 LMIG. More specifically, the project will consist of shoulder scraping, 1.5" 9.5mm asphalt paving, crack relief interlayer, striping, shoulder backing, grassing, and traffic control. Each Contractor must prequalify for bid by submitting a completed "Statement of Bidder Qualifications" form supplied by the Engineer. Question Deadline 07/22/2025 Requests for interpretations of Drawings and Specifications must be made in writing to the Engineer no later than seven (7) days prior to date set for receipt of bids Bids will be accepted from prequalified bidders only. Bids must be accompanied by a certified check or bid bond in an amount equal to at least five percent (5%) of total amount bid for the completed work. No bids may be withdrawn for a period of sixty (60) days after the closing time schedule for receipt of bids. The Owner reserves the right to accept or reject any or all bids and to waive informalities. Award of the contract, if it is awarded, will be to the lowest responsible bidder.

Post-Bid

Roads / Highways

$310,000.00

Public - City

Paving, Site Work

11

22

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
58
Bidding Soon
900
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2025

August 28, 2025

Project location map

Multiple Locations, Folkston, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.