BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2026 at 8:00 PM

Updated May 27, 2026

Demolition, site work and paving for a bridge / tunnel in Folkston, Georgia. Completed plans call for the demolition of a bridge / tunnel.

Question Deadline 05/19/2026 To receive consideration, such questions shall be submitted in writing to the Engineer at least 7 days before the advertised date for receipt of bids. In general, the Engineer will neither approve nor disapprove particular products prior to opening of the bids. The work under this Contract will consist generally of the following Proposed demo of existing bridge structure, installation of 8x7 concrete box culvert with wingwalls, parapets, energy dissipaters, and aprons, the removal and replacement of 500 yd 2 of asphalt, rip rap, erosion control measures, traffic control, and all other necessary appurtenances for a complete job. All work on the Project must be completed within 75 consecutive calendar days of date of notice to proceed. This project must be at substantial completion by August 3rd, for the beginning of the school year. The work will consist of the removal of the existing bridge structure and installation of an 8'x7' concrete box culvert with wingwalls, parapets, energy dissipaters, and aprons; removal and replacement of 500 square yards of asphalt, installation of rip rap, erosion control measures, traffic control, and all other necessary appurtenances for a complete job. All work must be completed within 75 consecutive calendar days from the notice to proceed, and the project must reach substantial completion by August 3rd. Bids must be submitted on provided Bid Proposal Forms, in accordance with the Contract Documents, Plans, and Specifications. Bid documents may be obtained from Hofstadter and Associates, Inc., with a non-refundable deposit. Sealed bids must be filed before the designated time and must include a Bidder's Bond for 10 percent of the bid amount, to be forfeited as liquidated damages if the bidder fails to enter into a contract and provide the required Payment Bond, Performance Bond, and Insurance Certificates. No bids can be withdrawn for 60 days after opening. The County reserves the right to reject any or all bids and to disregard irregularities or informalities in proposals.

Post-Bid

Bridges / Tunnels

$400,000.00

Public - County

Demolition, Paving, Site Work

24

7

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
63
Bidding Soon
1,023
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2026

June 25, 2026

Project location map

Sardis Rd, Folkston, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.