Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 22, 2026 at 8:00 PM
Updated July 28, 2026
Site work and paving for a road / highway in Folkston, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.
PCC Slab Replacement services ancillary to the construction and maintenance of a public road. The Department reserves the right to modify existing provisions or include additional provisions, which are not currently addressed herein and further reserves the right to reject any or all bids, and to waive technicalities and in-formalities at its discretion. Question Deadline 07/28/2026 at 2:00 PM ET All questions concerning this ITB must be submitted in writing via email to the Issuing Officer SamJones@dot.ga.gov The Contractor will be required to perform prep work, removal , installation and cleanup for Concrete and Portland Cement Concrete (PCC) Pavement Rehabilitation Services defined in this ITB. The Contractor shall supply the labor, materials, equipment, tools, means of transportation , traffic control , and incidentals to perform work in accordance with the specifications, construction standards and details, project details set forth herein. The Contractor must furnish equipment in good operating condition and such equipment must be operated by properly trained and qualified personnel . The Contractor must furnish the fully operational equipment needed to perform Concrete and Portland Cement Concrete (PCC) Pavement Rehabilitation Services at such time, and at such location(s) as directed by the Department. Prior to the start of work, Contractor must inspect the equipment to ensure it is fully operational for the performance of its intended purpose. The Contractor will also be responsible for any traffic control, licenses, and permits required to satisfy the duties required herein. The Contractor shall be responsible for ensuring a safe work environment for employees and the traveling public within the time schedule specified. When replacing PCC Slabs, the contractor is not allowed to remove the existing slab without being able to puor concrete within seven (7) calendar days of opening the road surface.
Sub-Bidding
$2,000,000.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 11, 2026
October 5, 2026
GA-15, Folkston, GA
Related To This Project
Folkston, GA
Bid Date: May 26 2026
Folkston, GA
Bid Date: Apr 21 2026
Folkston, GA
Bid Date: Mar 20 2026
Folkston, GA
Bid Date: Mar 10 2026
Folkston, GA
Bid Date: Mar 09 2026
Folkston, GA
Bid Date: Mar 09 2026
Folkston, GA
Bid Date: Jul 29 2025
Folkston, GA
--
Folkston, GA
Bid Date: Jul 01 2025
Folkston, GA
Bid Date: Mar 26 2025
Folkston, GA
Bid Date: Mar 26 2025
Folkston, GA
Bid Date: Nov 03 2021
Folkston, GA
Bid Date: Jan 23 2025
Folkston, GA
Bid Date: Dec 13 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
