Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 3, 2025 at 8:00 PM
Updated July 18, 2025
Site work and paving for a civil project in Springfield, New Hampshire. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
Village District of Eastman (Owner) Sealed bids for construction of West Cove A Water Main Improvements for the Village District of Eastman The scope of work for the base bid includes the replacement of 61 water services on Bay Tree Lane, Old Beach Circle, and College Overlook. This work shall also consist of removing and replacing up to 475 linear feet of the existing PVC water main to facilitate the replacement of the water services, water service pipe saddles, corporation stops, service pipe, and curb stops. Water main replacement shall include all fittings required to provide connection of new water main to existing. Base bid work shall also include the installation of three (3) gate valves, three (3) flushing hydrants, temporary water system, and gravel roadway rehabilitation. The scope of work for Bid Alternate No. 1 includes removal and replacement of the remaining water system on Bay Tree Lane, Old Beach Circle, and College Overlook. This shall consist of installation of approximately 1,425 linear feet of 4-inch PVC water main, fittings. Work also includes connection to existing asbestos cement (AC) water mains via tapping sleeve and valve assembly at two (2) locations, installation of five (5) gate valves, maintenance of traffic, and roadway rehabilitation including asphalt pavement and gravel road repair. Construction for the Base Bid and/or Base Bid plus Bid Alternate No. 1 shall not begin prior to Labor Day, September 1, 2025. 1. Completion time for the base bid project shall be as follows if accepted by Owner: Substantial Completion: November 21, 2025 Final Completion: June 5, 2026 The Bidder further agrees to pay liquidated damages in the amount of $1,300.00 for each milestone, for each consecutive calendar day that the work has not been completed. Definition of milestones provided in Section 01014 SCOPE AND SEQUENCE OF WORK. No Bidder may withdraw a Bid within 30 days after the actual date of opening thereof. The selected contractor shall furnish a performance bond and a payment bond in amount at least equal to one hundred percent (100%) of the contract price as stipulated in Section 00700 GENERAL CONDITIONS of these specifications. Any request for interpretation of plans and specifications may be submitted in writing at that time. Bidders will have an opportunity to view the site of the work following the Prebid Conference. The Owner reserves the right to waive any informalities in bids and to reject any or all bids.
Post-Bid
Water / Sewer
$3,000,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 17, 2025
September 1, 2025
53 Wellfield Road, Springfield, NH
Related To This Project
Springfield, NH
--
Springfield, NH
Bid Date: Oct 17 2024
Springfield, NH
Bid Date: Aug 15 2023
Claremont, NH
Bid Date: Jul 29 2025
Newington, NH
Bid Date: Jul 28 2025
Plainfield, NH
Bid Date: Jun 30 2025
Durham, NH
Bid Date: Jul 30 2025
Brookline, NH
Bid Date: Jul 23 2025
Belmont, NH
Bid Date: Jul 28 2025
Strafford, NH
Bid Date: Jul 25 2025
Manchester, NH
Bid Date: Jul 02 2025
Belmont, NH
Bid Date: Jul 28 2025
Allenstown, NH
Bid Date: Jun 26 2025
Newington, NH
Bid Date: Jul 18 2025
Raymond, NH
Bid Date: Jun 12 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
