Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 2, 2025 at 8:00 PM
Updated July 15, 2025
Renovation of an educational facility in Lock Haven, Pennsylvania. Completed plans call for the renovation of a 11,500-square-foot educational facility.
Robb Elementary Hallway Floor Replacement The Keystone Central School District is accepting proposals for the replacement of approximately 11,500 sq ft of existing vinyl flooring with an epoxy flake system in the basement and first floor hallways at Robb Elementary School 400 East Church Street, Lock Haven, PA 17745 Questions may be directed to the Purchasing Department at 570-893-4900, Opt. 1, Ext. 2301, or via email to purchasing@kcsd.us. A Addendums & Questions are addressed on our Keystone Central Website Service is to be provided under this proposal are as follows: 1) The Keystone Central School District proposes to enter into an agreement with a contractor to provide services to replace existing vinyl flooring with an epoxy flake system. 2) The purpose of this proposal is to provide professional service to demo the existing flooring to bare concrete, then replace it with a new epoxy flake floor system. 3) Approximately 3,500 sq ft of epoxy with six inch cove base and 8,000 sq ft of epoxy without. 4) Contractor is to provide all necessary labor, material and disposal. 5) Contractor is required to dispose of all waste in accordance with all laws and regulations of the Commonwealth of PA. 6) Concrete surface profile must be met so that it is suitable for application and adhesion. 7) Saw cut and use crack filler to fill all cracks so that the existing concrete floor is seamless. 8) Apply surface primer. 9) Apply epoxy with Moisture Vapor Barrier (MVB). 10) Apply flakes, color choice is FB-310 Orbit. Two separate broadcasts. 11) Apply two separate grout coats. 12) Finish with a urethane coat. 13) Contractor shall carry insurance applying to all operations by them, their agents and employees, and shall provide proof of such coverage. 14) Contractor is responsible for protection of glass and other surfaces 15) Pennsylvania prevailing wages will apply.
Post-Bid
Educational
$265,407.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 14, 2025
August 13, 2025
400 E Church St, Lock Haven, PA
Related To This Project
Lock Haven, PA
Bid Date: Aug 26 2025
Lock Haven, PA
Bid Date: Sep 03 2025
Lock Haven, PA
Bid Date: Dec 17 2025
Lock Haven, PA
Bid Date: Dec 19 2025
Lock Haven, PA
Bid Date: Dec 19 2025
Lock Haven, PA
Bid Date: Dec 09 2025
Lock Haven, PA
Bid Date: Nov 20 2020
Lock Haven, PA
Bid Date: Jul 02 2025
Lock Haven, PA
--
Lock Haven, PA
Bid Date: Jul 01 2025
Lock Haven, PA
Bid Date: May 23 2025
Lock Haven, PA
Bid Date: Apr 07 2021
Lock Haven, PA
Bid Date: May 22 2025
Lock Haven, PA
Bid Date: Apr 07 2025
Lock Haven, PA
Bid Date: Apr 08 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
