Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 12, 2025 at 8:00 PM
Updated September 13, 2025
Site work and paving for a road / highway in Woodland Park, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of September 12th, 2025, the project was awarded to Pyramid Construction, with an awarded amount of $153,584.48.** Reference Number 0000390978 Bid Intent Not Available Job Location: Center St and Centre Camino, from Vaquero Senda to County Road Project Overview This project consists of furnishing all labor, equipment, and materials required to complete a 2-inch asphalt overlay on Centre Camino, covering approximately 47,472 square feet between the intersections of Vaquero Senda and County Road. The purpose of this overlay is to restore surface integrity, enhance ride quality, and prolong the life of the existing pavement. All work is to by accordance with City of Woodland Park Engineering Spec and the 2025 CDOT Standard and for Road and Bridge Construction. Add Alternate - 1.5-Inch Asphalt Milling: As an add alternate to the base project, the contractor shall furnish all labor, equipment, and materials necessary to perform a 1.5-inch cold mill (asphalt removal) of the existing pavement surface on Centre Camino. The milling area encompasses approximately 47,472 square feet, between the intersections of Vaquero Senda and County Road. The purpose of this milling is to improve surface bonding, ensure proper overlay thickness, and enhance long-term pavement performance. All milling operations shall be conducted in accordance with the City of Woodland Park Engineering Specifications and the 2025 CDOT Standard Specifications for Road and Bridge Construction. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Contractors License Required - Installation Required - Insurance Required - License Required - Warranty Information Required Bonding Requirements - Bid Bond 5 % - Performance Bond 50 % - Payment Bond 50 % Question Deadline 07/11/2025 at 5:00 PM MT Questions are submitted online No
Award
Roads / Highways
$153,584.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 18, 2025
August 18, 2025
Center St & Centre Camino, Woodland Park, CO
Related To This Project
Woodland Park, CO
Bid Date: Aug 13 2025
Woodland Park, CO
--
Woodland Park, CO
--
Woodland Park, CO
Bid Date: Aug 22 2025
Woodland Park, CO
Bid Date: Apr 18 2025
Woodland Park, CO
Bid Date: May 02 2025
Woodland Park, CO
Bid Date: Apr 11 2025
Woodland Park, CO
--
Woodland Park, CO
Bid Date: Mar 17 2025
Woodland Park, CO
Bid Date: Feb 14 2025
Woodland Park, CO
Bid Date: Feb 21 2025
Woodland Park, CO
Bid Date: Dec 11 2024
Woodland Park, CO
Bid Date: Dec 18 2024
Woodland Park, CO
Bid Date: Nov 08 2024
The Best Gift for Your Business? Seeing the Future of Construction.
We’re unwrapping exclusive project leads early this year. Gain instant access to commercial data that keeps you steps ahead of the competition. Sign up today to see the projects others won't discover until they're already spoken for.
