BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2025 at 8:00 PM

Updated September 13, 2025

Site work and paving for a road / highway in Woodland Park, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of September 12th, 2025, the project was awarded to Pyramid Construction, with an awarded amount of $153,584.48.** Reference Number 0000390978 Bid Intent Not Available Job Location: Center St and Centre Camino, from Vaquero Senda to County Road Project Overview This project consists of furnishing all labor, equipment, and materials required to complete a 2-inch asphalt overlay on Centre Camino, covering approximately 47,472 square feet between the intersections of Vaquero Senda and County Road. The purpose of this overlay is to restore surface integrity, enhance ride quality, and prolong the life of the existing pavement. All work is to by accordance with City of Woodland Park Engineering Spec and the 2025 CDOT Standard and for Road and Bridge Construction. Add Alternate - 1.5-Inch Asphalt Milling: As an add alternate to the base project, the contractor shall furnish all labor, equipment, and materials necessary to perform a 1.5-inch cold mill (asphalt removal) of the existing pavement surface on Centre Camino. The milling area encompasses approximately 47,472 square feet, between the intersections of Vaquero Senda and County Road. The purpose of this milling is to improve surface bonding, ensure proper overlay thickness, and enhance long-term pavement performance. All milling operations shall be conducted in accordance with the City of Woodland Park Engineering Specifications and the 2025 CDOT Standard Specifications for Road and Bridge Construction. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Contractors License Required - Installation Required - Insurance Required - License Required - Warranty Information Required Bonding Requirements - Bid Bond 5 % - Performance Bond 50 % - Payment Bond 50 % Question Deadline 07/11/2025 at 5:00 PM MT Questions are submitted online No

Award

Roads / Highways

$153,584.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
39
Bidding Soon
1,145
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2025

August 18, 2025

Project location map

Center St & Centre Camino, Woodland Park, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.