BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 3, 2026 at 7:00 PM

Updated February 4, 2026

Site work and paving for a mixed-use development in Woodland Park, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000406584 Bid Intent Not Available The Fairview Street Improvements Project consists of roadway and pedestrian infrastructure improvements along Fairview Street between Midland Avenue and Sheridan Avenue in the City of Woodland Park, Teller County, Colorado. The project is intended to improve pavement condition, drainage performance, accessibility, and overall safety for vehicles and pedestrians while minimizing impacts to adjacent properties. Planned improvements generally include milling and asphalt overlay of the existing roadway, localized full-depth pavement repairs, cross-slope corrections to meet current standards, new curb and gutter, and construction of ADA-compliant curb ramps at intersections and pedestrian crossings. Targeted roadway widening is included in select areas to improve operations and transitions, along with associated grading and drainage improvements. Improvements within the Cavalier Park parking area are also included as part of the project limits. The work includes coordination with existing utilities, traffic control, and restoration of disturbed areas. The project has been designed to balance constructability, budget constraints, and long-term maintenance considerations, with construction documents prepared for competitive bidding and efficient construction. Question Deadline 02/11/2026 at 5:00 PM MT Questions are submitted online Yes Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Contractors License Required - Installation Required - Insurance Required - License Required Bonding Requirements - Bid Bond 10 % - Performance Bond 50 % - Payment Bond 50 % A certified check or bank draft, on a responsible, solvent bank, or a satisfactory Bid Bond executed by the Bidder and a recognized Colorado licensed Surety Company, payable to the City of Woodland Park, Colorado, in the amount of not less than five percent (5%) of the total bid, shall be submitted with each bid as security that the Bidder to whom the contract may be awarded will enter into a contract in accordance with this notice, and give bond as hereinafter provided. No bid shall be withdrawn after the opening of the bids, without the consent of the City of Woodland Park, for a period of sixty (60) days after the scheduled Bid Opening. The successful bidder will be required to furnish satisfactory performance and payment bonds in the full amount of the bid or proposal. The City of Woodland Park, Colorado reserves the right to reject any and all bids, to waive any informality in bidding, and to make Award in such a manner as it may deem right and proper for the best interest of the City of Woodland Park.

GC Bidding

Roads / Highways

$800,000.00

Public - City

Paving, Site Work

22

3

3

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
246
Active Projects
126
Bidding Soon
1,091
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2026

March 23, 2026

Project location map

S Fairview St, Woodland Park, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.