BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 27, 2026 at 7:00 PM

Updated January 28, 2026

Site work and paving for a mixed-use development in Woodland Park, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Reference Number 0000407763 The project generally consists of the following work: _ Traffic Control Must Comply with the MUTCD _ Contractor is to provide erosion control plan _ Removal of existing brick pavers. _ Replacement of brick pavers with 4 inches of asphalt pavement, placed in the same footprint as the removed bricks. achieving a 3% profile on the roadway when possible. _ Removal and replacement of curb and gutter, to match existing conditions. _ Demo of concrete collars located where brick pavers transition to asphalt. _ Demo concrete around valve boxes _ Reset manhole from the cone up with new material including demo of the concrete _ QC Testing is the responsibility of the contractor. Using an approved third party. The City of Woodland Park ("City") is requesting proposals from qualified and experienced contractors to furnish all labor, materials, equipment, and services necessary to remove existing brick pavers and replace them with asphalt pavement, along with associated concrete and curb and gutter work. This is a two-phase project that will be that the city would like to award at one time pending bid results. The project must be completed by August 7, 2026. Question Deadline 02/11/2026 at 5:00 PM MT Questions are submitted online Yes The City of Woodland Park, Colorado reserves the right to reject any and all bids, to waive any informality in bidding, and to make Award in such a manner as it may deem right and proper for the best interest of the City of Woodland Park. General Requirements - Bid Deposit Required - Contractors License Required - Installation Required - Insurance Required - License Required Bonding Requirements - Bid Bond 10 % - Performance Bond 50 % - Payment Bond 50 % A certified check or bank draft, on a responsible, solvent bank, or a satisfactory Bid Bond executed by the Bidder and a recognized Colorado licensed Surety Company, payable to the City of Woodland Park, Colorado, in the amount of not less than five percent (5%) of the total bid, shall be submitted with each bid as security that the Bidder to whom the contract may be awarded will enter into a contract in accordance with this notice, and give bond as hereinafter provided. No bid shall be withdrawn after the opening of the bids, without the consent of the City of Woodland Park, for a period of sixty (60) days after the scheduled Bid Opening. The successful bidder will be required to furnish satisfactory performance and payment bonds in the full amount of the bid or proposal.

GC Bidding

Roads / Highways

$400,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
121
Bidding Soon
1,093
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2026

March 23, 2026

Project location map

Multiple Locations, Woodland Park, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.