Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 29, 2025 at 8:00 PM
Updated July 31, 2025
Site work for a water / sewer project in Sula, Montana. Completed plans call for site work for a water / sewer project.
NOTICE: Amendment 1 changes the requirement for the pump house from concrete to a wooden frame structure. Adds a revised Schedule of Items, Statement of Work and Pumphouse Requirements document. GAOA Sula Housing and District Water System Improvements NOTICE: A site visit is scheduled for Wednesday, July 9th at 10:00 am Sula Ranger Station Office 7338 Highway 93 S Sula, MT 59871 Questions are due NLT than 5:00PM on 07/15/2025 Period of Performance: 08/15/2025 to 05/31/2026 Price Range. Greater than $250,000 and Less than $500,000 Questions regarding the project may be directed to Justin Catanach, US Forest Service, Region 1 Civil Engineer, at (406) 363-7170 and Shawn Boelman, US Forest Service, Region 1 Facilities Engineer (406) 363-7107. (e) Pre-Bid Conference. A pre-bid conference will be scheduled for this project. (f) Start Work. Work may not begin until August 15, 2025. (g) Period of Performance. All work items must be completed by May 31,2026. Work cannot occur during November and December of 2025, or during January, February, and March of 2026. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The intent of this project is to replace the existing pump house, all interior utilities, as well as replacing existing valves on the storage tank at the Sula Ranger Station. Also, the project will install a new dedicated supply water line to the storage tank. This project is located on the Bitterroot National Forest, Darby / Sula Ranger District. The Sula Ranger District is located approximately 38 miles South of Darby, MT. From Darby, drive south on US 93 approximately 38.3 miles, and turn left into the parking lot of the ranger station. (See Project Vicinity Map Attachment 3) The intent of this project is to replace the existing pumphouse, all interior utilities, as well as replacing existing valves on the storage tank at the Sula Ranger Station. Also, the project will install a new dedicated supply water line to the storage tank. The Sula Ranger Station is located on the Darby / Sula Ranger District of the Bitterroot National Forest. The work involved with this project includes, but is not limited to, excavating and preparing foundations, erosion control measures, constructing wood framed structures, trenching, installing supply lines, plumbing, installing water system controls, electrical wiring, and revegetation of disturbed areas Project Location. This project is located on the Bitterroot National Forest, Darby / Sula Ranger District A. This project is located at the Sula Ranger Station. The address is 7338 US HWY 93, Sula, MT 59871 approximately 36 miles south of Hamilton, MT. Base Bid includes the following: Demolishing the existing pump house and abandoning in-place the existing 2-inch supply line that connects to the 6-inch main line. Installing a new pre-cast concrete pump house placed next to the location of the existing pump house. Installation of new pump house internal piping, electrical, controls (converting existing float controls to a pressure transducer) and heating. Connecting the new pump house piping to the existing well. Installation of a new dedicated water supply line to the existing 29,000-gallon water storage tank.
Post-Bid
Water / Sewer
$500,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 30, 2025
August 15, 2025
7338 US-93, Sula, MT
Related To This Project
Sula, MT
Bid Date: Jul 31 2024
Yogo Crossing, MT
Bid Date: Jul 29 2025
Lewistown, MT
Bid Date: Jul 08 2025
Missoula, MT
Bid Date: Jul 22 2025
Missoula, MT
Bid Date: Jul 22 2025
Bozeman, MT
Bid Date: Jul 11 2025
Yogo Crossing, MT
Bid Date: Jul 02 2025
Great Falls, MT
Bid Date: Jul 16 2025
Billings, MT
Bid Date: Aug 15 2025
Garnet, MT
Bid Date: Aug 01 2025
Butte, MT
Bid Date: Jul 14 2025
Bozeman, MT
Bid Date: Jul 10 2025
Plains, MT
Bid Date: Jul 15 2025
Virginia City, MT
Bid Date: Jul 14 2025
Bozeman, MT
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
