BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 7, 2025 at 8:00 PM

Updated August 8, 2025

Site work and paving for a civil project in Wallula, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

As of August 7, 2025, project was awarded to Premier Excavation, awarded amount is $507,820.29. The work covered by these Specifications includes providing and installation of steel casing pipe by the boring/jacking method, installation of steel casing pipe by open cut method, and installation of casing at locations identified as non-potable utility crossings. Refer to the Drawings for specific locations of each installation method. The Contractor shall furnish all labor, equipment, casing pipe, carrier pipe, casing spacers, casing pipe end seals, and other items and materials as required to construct a complete installation as shown on the Drawings and as required by the appropriate permits and pipeline crossing agreements. All work performed within the railroad Right of Way shall be in accordance with the requirements of the respective agency, which are made a part of these Specifications. Question Deadline 07/11/2025 Questions received less than five days prior to the date for opening of Bids may not be answered. All questions about the meaning or intent of the Bidding Documents are to be submitted to the Engineer in writing. Doc Notes : Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays between the hours of 8:00 a.m. and 5:00 p.m., or at the other locations listed below. Description: he Project includes the following Phase 1 Work: Construction of approximately 1,190 linear feet of (LF) 18 inch ductile iron (DI) water main; installation of 80 LF of 18-inch DI water main in the existing casing, one hydrant assembly, 18 inch butterfly valves, an air release valve, and 2-inch conduit and junction boxes; railroad grading work; clearing and grubbing; embankment compaction; gravel surfacing; hydroseeding; and general surface restoration; and other related Work. Phase 2 shall be completed by others. Additional Description: The Contractor is subject to all requirements related to Prevailing Wage Rates, EEO, and Washington State Contracting Laws, etc. The Contract Time and Milestones for the Work shall be as outlined in the Special Provisions. Work shall be physically completed within 40 working days. If awarded, it is anticipated the Notice to Proceed will be issued by August 1, 2025. Est. Value Notes: $500K

Award

Water / Sewer

$507,820.00

Public - County

Paving, Site Work

36

13

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
24
Bidding Soon
460
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2025

August 1, 2025

Project location map

Multiple Locations, Wallula, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.