Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 8, 2025 at 8:00 PM
Updated September 9, 2025
Site work for a civil project in Orange Park, Florida. Completed plans call for site work for a water / sewer project.
The Selected Contractor shall perform the Work complete and in place for construction of new high service pumps, two (2) new ground storage tanks, yard and mechanical piping improvements, new instrumentation and controls, and new electrical systems as required for the improvements to the Meadowbrook WTP as described in the Solicitation Documents. 1. Mobilization/Demobilization, General Requirements, Bonds and Insurance. 2. Contractor is responsible for protecting existing materials, structures, and equipment on-site during construction activities. 3. Site Work o Site Preparation. o Erosion Control. o Salvage: Prior to demolition of equipment or facilities, the Contractor shall coordinate with the Owner on any Owner designated equipment identified to be salvaged. Contractor shall move the identified equipment and/or materials to the warehouse on-site storage area protection from the elements. Salvage equipment includes, but is not limited to (the Owner reserves the right to salvage existing equipment not identified on this list): o Existing High Service Pumps. o Hydro-pneumatic Tanks. o Demolition. o Site grading. o Site restoration including seeding, grassing, and other restoration. Contractor agrees to restore as necessary, any systems that might be impacted during construction. o Proper disposal of excess and unsuitable excavation and removal. 4. Replacement of the existing high service pumps with five new high service pumps. 5. Two new prestressed concrete ground storage tanks. 6. Yard and mechanical piping improvements. 7. New magnetic flow meter assembly. 8. New asphalt driveway. 9. Improvements to the electrical and instrumentation and controls systems. 10. Electrical, Instrumentation and Control work shall be constructed in accordance with CCUA Water Treatment Plant Standards, drawings, and specifications to provide a functional and integrated electrical system. 11. Conducting all necessary testing and start-up. 12. All other Work shown in the Contract Drawings and Specifications. A detailed summary of Work is provided in the technical specifications. CONTRACTOR is responsible for protecting existing materials, structures, and equipment on-site during construction activities. All materials, methods of construction, and standards must be in accordance with the AUTHORITYs approved material manual, specifications, and details. Issue Notice of Intent to Award:September 3, 2025, 5:00pm. All questions about the meaning or intent of the Bidding Documents are to be submitted to the Clay County Utility Authority's OpenGov Procurement Portal no later than 12:00 P.M. (EDT) on July 22, 2025
Award
Water / Sewer
$5,197,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 14, 2025
October 15, 2025
301 Cottonwood Ln, Orange Park, FL
Related To This Project
Orange Park, FL
Bid Date: Jan 17 2019
Orange Park, FL
Bid Date: Sep 09 2025
Orange Park, FL
Bid Date: Sep 09 2025
Orange Park, FL
--
Orange Park, FL
Bid Date: Sep 18 2025
Orange Park, FL
Bid Date: Oct 06 2025
Orange Park, FL
Bid Date: Nov 25 2025
Orange Park, FL
Bid Date: Dec 11 2025
Orange Park, FL
Bid Date: Jul 28 2025
Orange Park, FL
Bid Date: Jul 29 2025
Orange Park, FL
Bid Date: Jun 05 2025
Orange Park, FL
--
Orange Park, FL
Bid Date: May 06 2025
Orange Park, FL
Bid Date: May 01 2025
Orange Park, FL
Bid Date: May 06 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
