Site work for a civil project in Orange Park, Florida. Completed plans call for site work for a water / sewer project.

The Selected Contractor shall perform the Work complete and in place for construction of new high service pumps, two (2) new ground storage tanks, yard and mechanical piping improvements, new instrumentation and controls, and new electrical systems as required for the improvements to the Meadowbrook WTP as described in the Solicitation Documents. 1. Mobilization/Demobilization, General Requirements, Bonds and Insurance. 2. Contractor is responsible for protecting existing materials, structures, and equipment on-site during construction activities. 3. Site Work o Site Preparation. o Erosion Control. o Salvage: Prior to demolition of equipment or facilities, the Contractor shall coordinate with the Owner on any Owner designated equipment identified to be salvaged. Contractor shall move the identified equipment and/or materials to the warehouse on-site storage area protection from the elements. Salvage equipment includes, but is not limited to (the Owner reserves the right to salvage existing equipment not identified on this list): o Existing High Service Pumps. o Hydro-pneumatic Tanks. o Demolition. o Site grading. o Site restoration including seeding, grassing, and other restoration. Contractor agrees to restore as necessary, any systems that might be impacted during construction. o Proper disposal of excess and unsuitable excavation and removal. 4. Replacement of the existing high service pumps with five new high service pumps. 5. Two new prestressed concrete ground storage tanks. 6. Yard and mechanical piping improvements. 7. New magnetic flow meter assembly. 8. New asphalt driveway. 9. Improvements to the electrical and instrumentation and controls systems. 10. Electrical, Instrumentation and Control work shall be constructed in accordance with CCUA Water Treatment Plant Standards, drawings, and specifications to provide a functional and integrated electrical system. 11. Conducting all necessary testing and start-up. 12. All other Work shown in the Contract Drawings and Specifications. A detailed summary of Work is provided in the technical specifications. CONTRACTOR is responsible for protecting existing materials, structures, and equipment on-site during construction activities. All materials, methods of construction, and standards must be in accordance with the AUTHORITYs approved material manual, specifications, and details. Issue Notice of Intent to Award:September 3, 2025, 5:00pm. All questions about the meaning or intent of the Bidding Documents are to be submitted to the Clay County Utility Authority's OpenGov Procurement Portal no later than 12:00 P.M. (EDT) on July 22, 2025

Award

Water / Sewer

$5,197,000.00

Public - County

Site Work

55

35

12

10

Subscribe For Documents

77 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
91
Bidding Soon
1,342
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2025

October 15, 2025

Project location map

301 Cottonwood Ln, Orange Park, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.