BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 3, 2025 at 8:00 PM

Updated September 4, 2025

Site work and new construction of a detention facility in Montgomery, Pennsylvania. Completed plans call for the construction of a 18,000-square-foot, one-story above grade detention facility; and for site work for a detention facility.

SCI Muncy - Construction of New Records/Intake Building - HVAC LIQUIDATED DAMAGES = $500.00 per day HVAC Construction - ALL BASE BIDS (#1, #2 & #3) SDB = 6% VBE = 3% This procurement has SDB or VBE goals set. HVAC Construction - ALL BASE BIDS (#1, #2 & #3) SDB = 6% VBE = 3% Prior approval by DOC is required for entry inside secure areas. Submit at least a week to ten days prior to the Pre-Bid meeting if inside access is required. A video tutorial is available on the e-Builder site for first time users to learn how to navigate e-Builder. Technical support is also available via email at support@e-builder.net or by phone at 1-888-288-5717. The Department of General Services Capital Programs and the Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) identified this procurement as eligible for the setting of Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals. However, BDISBO did not set SDB and/or VBE participation goals for those procurements that are less than the $600,000 threshold required to set either goal. In addition, there will be no points allocated toward SDB/SB participation for this procurement. This is a significant programmatic change from the SDB and SB Participation program contained in prior Projects issued by Capital Programs. Bidders now must agree to meet the SDB and VBE Participation Goals in full or demonstrate that they have made Good Faith Efforts to meet the Goals. Refer to the Instructions to Bidders section regarding Small Diverse Business and Veteran Business Enterprise Participation for further information. Duration: 480 Calendar Days from date of Initial Job Conference ESTIMATED RANGE: HVAC - $700,000 - $800,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document PROJECT NO. DGS 0574-0026-P8 PHASE 001 DGS C-0574-0026-008 Phase 8.2—

Bid Results

Jails / Prisons

$696,500.00

Public - State/Provincial

New Construction, Site Work

113

36

25

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
103
Bidding Soon
1,140
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2025

September 19, 2025

Project location map

6454 PA-405, Montgomery, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.