BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 9, 2025 at 7:00 PM

Updated December 10, 2025

Site work and paving for a civil project in Montgomery, Pennsylvania. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

The Description and Location of the Project Are as Follows: Mill and Overlay, Bridge Rehabilitation, Line Painting, and Other Miscellaneous Construction as Indicated on the Approved Drawings Included in the Bid Package for State Route 54, Section 101, in Lycoming County, Muncy Creek Township From Approximately 0.56 Miles North of Sr 405 at Segment 0110 Offset 1225 to Approximately 0.25 Miles South of Sr 405 at Segment 0100 Offset 1495 in Lycoming County, Montgomery Borough and Mill and Overlay, Bridge Rehabilitation, Line Painting, and Other Miscellaneous Construction as Indicated on the Approved Drawings Included in the Bid Package for State Route 220, Section 268, in Lycoming County, Woodward Township From Approximately 0.03 Miles West of Sr 3013 at Segment 0191 Offset 3169 to Approximately 2.68 Miles East of Sr 3007 at Segment 0191 Offset 2761 in Lycoming County, Woodward Township. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: Penndot Oversight Non-nhs Dbe: 0% Structure Work: 70.00% Pre-bid Meeting: None Anticipated Ntp: 03/02/2026 Wage Rates: Yes Required Completion: 09/23/2026 Prequalification Requirement: Yes State Type of Work: Deck Rehabilitation Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT - SR 54 Over Susquehanna River *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Bridges / Tunnels

$2,500,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
116
Bidding Soon
1,389
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2026

March 2, 2026

Project location map

PA-54, Montgomery, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.