BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 23, 2025 at 8:00 PM

Updated July 24, 2025

Site work and paving for a playground / park / athletic field in Gary, Indiana. Completed plans call for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.

The City of Gary Department of Public Works invites quotes from qualified vendors to provide asphalt work per the following specifications: Brunswick Park-765 Clark Road * Mill two inches off the existing asphalt court. * Remove all vegetation & soil from cracks, apply weed killer, and infuse cracks with rubberized filler. * Apply liquid binder and overlay milled surface with two inches (2") of virgin asphalt * Seal surface and restripe to match existing. * Glen Ryan Park-4220 E. 6th Place * Same as Brunswick Park Roosevelt Park-2201 Harrison St. * Basketball Court: Same as Brunswick * Tennis Court * Remove all asphalt, fill voids in stone base.Apply vegetation killer over entire area.Install two (2") inches of asphalt base.Install one and a half inches of virgin asphalt.Seal surface, paint and stripe for roller rink. Ironwood Park-1119 E. 24th Ave. * North Basketball Court: * Same as Brunswick * South Basketball Court 1. Asphalt has been mostly removed. 2. Replace and compact missing stone 3. Apply vegetation killer. 4. Install two inches (2") of asphalt base. 5. Install one- and one-half inches of virgin asphalt 6. Seal surface, paint and stripe as required. 7. Install 2 Basketball goals as directed by owner. Howe Park: E 39th Ave and Vermont St. * Main Parking Lot: * 1. Mill 2" and replace surface layer with virgin asphalt and stripe as required. Tolleston Park: 1709 Ellsworth St. * West Basketball Courts (3) 1. Mill 2" of asphalt surface, remove roots from cracks, fill with approved rubberized sealant, apply vegetation killer, install 2" of virgin asphalt. 2. Seal and stripe the Basketball Court as directed. Install 6 goals as directed by owner. * Tolleston Park- SE Court 1. Same as West Court but for Pickle Ball Court Contractors who possess the necessary equipment, training, and experience are invited to submit a quote to the City pursuant to the specifications prepared, to provide asphalt services for the City, and subject to the execution of a contract to be prepared by the City of Gary. Questions regarding the RFQ must be submitted in writing to GenesisBurris, Executive Assistant, Public Works at gburris@gary.gov.

Post-Bid

Playgrounds / Parks / Athletic Fields

$100,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
434
Active Projects
259
Bidding Soon
3,157
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2025

August 22, 2025

Project location map

Multiple Locations, Gary, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.