Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 18, 2025 at 8:00 PM
Updated August 13, 2025
Site work and paving for a mixed-use development in Kissimmee, Florida. Completed plans call for site work for a transportation facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
The description of the proposed work includes but is not limited to the following: This project consists of the construction of airside and landside civil site work, electrical, power, fiber, and utility improvements to support the Parcel 8 Airpark Development area on the Kissimmee Gateway Airport on Dyer Blvd. This project also includes a medium intensity taxiway lighting system, upgrading the systems constant current regulator, vault work, cable and duct markers, junction bases, ground rods, and other electrical items necessary to meet FAA and FDOT standards. All work included is necessary to support the proposed aircraft hangar and client delivery center structures (constructed by others). This project includes but is not limited to all the supporting utilities required such as sanitary and storm sewer, potable water and fire service mains, hydrants, automatic security access gates, controllers, FAA security fencing, landscaping, irrigation, excavations, site lighting, marking, striping, signage, sidewalks, pavements, turfing, retaining walls, oil interceptors, and other civil site works. ...... pursuant to all applicable codes, FAA/FDOT standards, and the available project budget funds. Each bid must be accompanied by a cashiers check or by a Bid Bond in the amount of five (5) percent of the Total Bid Price, to include all alternates. If awarded the Contract, the Contractor shall provide a Performance Bond and Payment Bond satisfactory to the Owner, each to be in a sum of at least equal to the Total Bid Price. Question Deadline 08/07/2025 at 5:00 PM ET All questions regarding Bid Documents should be addressed to AVCON, INC., attention Sue Finney at sfinney@avconinc.com. Do not contact the Airport or the City. The Owner reserves the right to waive any informalities or technicalities, to reject any or all Bids, or to re-advertise for Bids. Award, if made, will be to the responsible and qualified Bidder whose Bid is responsive to the invitation and is most advantageous to the Owner, price and other factors considered. Liquidated damages for delay in completion of the contract will be in accordance with the Contract Documents. No Bid may be withdrawn after the scheduled Bid Closing time for a period of one hundred eighty (180) days. There are absolutely no stockpiled or other materials to be provided by the Airport for this project. All materials are to be provided by the Contractor. Any unsuitable or unused materials generated by the project shall be hauled off of Airport property and legally disposed, or placed in designated areas as directed by the Airport and/or shown in the contract documents. The Airport shall have first right of refusal on all unused or excess materials. The Airport and Airports authorized representative shall solely determine what materials are unsuitable. The Owner reserves the right to award any combination of Bid Schedules/Alternates, or to reject all Bid Schedules/Alternates, or to reject any combination of Bid Schedules/Alternates, which are most advantageous to the Owner, price and all other factors considered, and as specified in accordance with the Contract Documents. The apparent low bidder, therefore, may not be the successful bidder awarded the contract, depending on the actual Bid Schedules and/or Alternates awarded. Bidders shall submit a general one year project warranty certificate on workmanship and labor, in addition to any product, equipment, and/or materials-specific manufacturers warranties prior to final payment. Materials Requirements: No existing materials currently stockpiled on Airport or City property are available for the project. Bidders are notified that all materials required for construction shall be brought in from off Airport property or taken from strictly within the project limits of specified work area only, pursuant to the plans and specifications.
Post-Bid
Transportation Terminals
$20,000,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 12, 2025
September 11, 2025
401 Dyer Blvd, Kissimmee, FL
Related To This Project
Kissimmee, FL
Bid Date: Aug 26 2025
Kissimmee, FL
--
Kissimmee, FL
Bid Date: Aug 26 2025
Kissimmee, FL
Bid Date: Aug 26 2025
Kissimmee, FL
Bid Date: Aug 26 2025
Kissimmee, FL
Bid Date: Aug 28 2025
Kissimmee, FL
Bid Date: Aug 21 2025
Kissimmee, FL
Bid Date: Aug 05 2025
Kissimmee, FL
--
Kissimmee, FL
Bid Date: Jul 29 2025
Kissimmee, FL
Bid Date: Jul 10 2025
Kissimmee, FL
Bid Date: Aug 26 2025
Kissimmee, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
