Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 16, 2025 at 8:00 PM
Updated July 30, 2025
Site work and paving for a mixed-use development in Ellensburg, Washington. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
TIMEFRAME The City of Ellensburg anticipates the completion of the project according to the following timeline: · Consultant agreement executed by mid-September, 2025 · Final design completed by the end of March, 2026 SUBMITTALS/EVALUATION CRITERIA Submittals should include the following information: Firm name, phone and fax numbers, Name of Principal-in-Charge and Project Manager, any subconsultants proposed, along with their respective Project Manager. Submittals will be evaluated and ranked based on the following criteria (maximum 10 points each): 1. Qualifications of key personnel 2. Firm experience with preparing PS&E for similar roadway improvement projects 3. Eastern/Central Washington design experience, including stormwater design 4. Approach to the project, including strategy for coordination with adjacent property owners 5. Ability to meet schedule 6. Familiarity with WSDOT/FHWA standards and federal funding 7. Past performance/references 8. Approach to meet the DBE goal (DBE Participation Plan) Please submit three copies of your Statement of Qualifications by 3:00 PM on Thursday, July 29th, 2025, plainly labeled “Vantage Highway Shared Use Pathway” to: City of Ellensburg Public Works Department, 501 N. Anderson St., Ellensburg, WA 98926.Any questions regarding this project should be directed to Josh Mattson at the Department of Public Works & Utilities, 509-962-7230. AMERICANS WITH DISABILITIES ACT (ADA) INFORMATION The City of Ellensburg in accordance with Section 504 of the Rehabilitation Act (Section 504) and the Americans with Disabilities Act (ADA), commits to nondiscrimination on the basis of disability, in all of its programs and activities.This material can be made available in an alternate format by emailing Lisa Young at youngl@ci.ellensburg.wa.us or by calling 509-962-7222. TITLE VI STATEMENT The City of Ellensburg, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252,42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The City of Ellensburg reserves the right to amend terms of this “Request for Qualifications” (RFQ) to circulate various addenda, or to withdraw the RFQ at any time, regardless of how much time and effort consultants have spent on their responses. PROJECT DESCRIPTION The work to be performed by the consultant consists of preparing preliminary engineering design, environmental permitting, cultural resource review, and bid documents (plans, specifications and opinion of cost) for the Vantage Highway Shared Use Pathway Project. The project limits are for approximately 2,100 linear feet, from Alder Street to Vista Road. University Way and Vantage Highway is an east/west principal arterial street in a residential and commercial area, with two travel lanes and gravel shoulders. The city is planning street and frontage improvements to the existing roadway. The proposed sidewalk and shared use pathway will connect to Vista Road, Alder Street, Brick Road, and the existing Palouse to Cascades Reconnect Trail near the Kittitas Valley Event Center. The project includes the following elements: · rehabilitation of the existing pavement by repairing the existing road base as needed, and pre-leveling/overlaying over the existing roadway; · widening the existing roadway to maintain two travel lanes and adding a center turn lane; · cement concrete curb, gutter, sidewalk, shared use pathway, driveway entrances and curb ramps; · an illumination system to light the roadway and sidewalk; · a pedestrian crosswalk beacon; · stormwater swales; · and landscaping. The City anticipates that the proposed improvements will fit within the existing right-of-way. The preliminary estimate for the engineering and construction of this project is $2,318,000. This project includes funding through the federal STBG program and has a 13% DBE goal. The City reserves the right to retain the services of the successful firm for any subsequent phases, such as construction engineering, associated with this project. A cost-plus fixed fee contract type is anticipated with the consultant for the engineering design of this project.
Conceptual
Roads / Highways
$2,318,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 15, 2025
Vantage Hwy, Ellensburg, WA
Related To This Project
Ellensburg, WA
--
Ellensburg, WA
Bid Date: Aug 13 2025
Ellensburg, WA
Bid Date: Aug 14 2025
Ellensburg, WA
Bid Date: Sep 26 2025
Ellensburg, WA
Bid Date: Sep 18 2025
Ellensburg, WA
Bid Date: Sep 18 2025
Ellensburg, WA
Bid Date: Aug 27 2025
Ellensburg, WA
Bid Date: Sep 26 2025
Ellensburg, WA
--
Ellensburg, WA
--
Ellensburg, WA
Bid Date: Jul 24 2025
Ellensburg, WA
Bid Date: Jul 03 2025
Ellensburg, WA
Bid Date: May 20 2025
Ellensburg, WA
--
Ellensburg, WA
Bid Date: Jun 05 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
