Site work and paving for a road / highway in Green Bay, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Town Board of the Town of Pittsfield, Brown County, Wisconsin Will Accept Quotes for the Shouldering or Shoulder Repair on the Following Town Roads: Shouldering Intersections: Glenfield Drive / Redwood Drive Southwest Quadrant Hazelwood Drive / Forest Drive Southwest Quadrant Norway Drive (East-west) /norway Drive (North-south) Southeast Quadrant Shouldering Roadways: The Following Sections of Roadway Shall Be Completed in the Order Listed to the Extent That is Budgeted by the Town of Pittsfield. The Assumed Quantity is Based on the Condition of the Existing Shouldering and is Subject to Change. Oakhill Drive (Glendale Tamarack) - 330 Tons Brookside Drive (Forest Brown Co Line) - 460 Tons Anston Road (Sunnybrook Westline) - 350 Tons Kunesh Road North (Quarry Road -300 Lf North) - 20 Tons Brookside Drive (Cth B Potters Crossing)-100 Tons Sunnybrook Drive Anston) - 260 Tons (South of School Drive (Cth U Radius) 170 Tons St. Augustine Road (South of Large Arch Culvert)-150 Tons Quarry Road (Sth 32 Kunesh North Road) - 350 Tons Matuszak Court - 70 Tons White Pine Drive (Spot Repairs) -30 Tons Rolling Hill Drive (Spot Repairs) 110 Tons Woodside Drive (Cth C Forest Drive) - 80 Tons Redwood Drive (Spot Repairs) - 80 Tons Brown County Line Road (Spot Repairs) - 130 Tons Norway Drive (Cth B North Road)-80 Tons -kunesh Miscellaneous Spot Repairs-450 Tons Total Tonnage Approximately -3,220 Tons Item No. 1 Description: Shouldering (2' Wide) Est Qty: 3,220 Unit Price: S 2025 Specifications for Shouldering -special Conditions Necessary. All Shouldering Shall Be Done Using a Shouldering Machine With Grading, Compaction and Sweeping Where Ne Equipment Shall Shall Be Capable of Placing Shouldering Material Without Marring or Damaging the Existing Pavement. Shouldering Shall Progress in the Order Listed Above With Intersections Taking Priority Then Working Down the List to a Pre-determined Budgeted Amount Shouldering on Brown County Line Road Will Require Grading to Remove Existing Shoulder Material That is Causing Ponding on the Road. All Shoulders Shall Be Graded Away From the Asphalt Roadway at a Minimum of 4% and Compacted With a Smoothdrum Roller. A Certificate of Insurance Must Be Included in the Pre-qualification. Payment and Performance Bonds Will Also Be Required. These and All Other Specifications From the Town of Pittsfield Must Be Adhered to. The Town of Pittsfield Has the Right to Reject All or Some of the Above Project Portions. All Projects Shall Be Completed by November 15, 2025. Contact Town Engineer, Paul Willis, Mead & Hunt, Inc., at (920) 593-6854 for Detailed Questions.

Award

Roads / Highways

$74,060.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
50
Bidding Soon
443
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2025

August 28, 2025

Project location map

Multiple Locations, Green Bay, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.