BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 18, 2025 at 8:00 PM

Updated August 26, 2025

Site work for a road / highway in Manchester, New Jersey. Completed plans call for site work for a road / highway.

Each bid must be accompanied by a Non-Collusion Certificate and by a guarantee in the amount of not less than ten percent (10%) of the total sum bid, provided such guarantee shall be for no more than twenty thousand ($20,000.00) dollars. The guarantee may be in one of the following forms: cashier's check, certified check or Proposal Bond, or eBond through Surety2000. The guarantee shall be payable to County of Ocean. In the event that a cashier's check or certified check is used, evidence of ability to furnish a Performance Bond and a Payment Bond in accordance with Subsection 151.03.01 must also accompany each bid; the usual form of Proposal Bond letter from a recognized Bonding Company will be acceptable. Question Response Deadline:July 18, 2025, 12:00pm Inquiries prior to bids in accordance with this Subsection shall be addressed to: Lauren E. Wines, Ocean County Engineering Department, 129 Hooper Ave., PO Box 2191, Toms River, NJ 08754, Telephone: 732-929-2130. The work to be performed under this Contract consists of the construction of a new traffic signal at County Route 571 (Ridgeway Road) and Beacon Street. There will be widening along the north side of County Route 571 in order to add dedicated left turn lanes at the signal. The Contractor shall anticipate tree and stump removal beyond the roadway widening on the north side of County Route 571. The new traffic signal will be ADA and MUTCD compliant. ADA compliant sidewalk and pedestrian facilities will be installed at the traffic signal. The existing roadway will consist of a 2" mill and pave along County Route 571 from Fairfield Street to Commonwealth Boulevard, and the reconstruction of southbound Beacon Street. In addition, this Contract includes improvements to the existing drainage system, plantings along the north side of County Route 571 to replace the vegetative buffer that will be cleared for the widening, and the replacement of guide rail on the southeast corner.

Award

Roads / Highways

$1,142,513.00

Public - County

Site Work

45

5

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
6
Bidding Soon
3,129
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2025

September 29, 2025

Project location map

Ridgeway Rd & Beacon St, Manchester, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.