Site work and paving for a road / highway in Long Beach, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

NIB -2 Pre-Bid Questions. All questions, including requests for interpretation or correction, or comments regarding the Contract Documents, must be submitted no later than August 19, 2025, at 5 p.m. Questions received after the pre-Bid question deadline will not be accepted. Neither questions nor answers are part of the Contract Documents, unless the question and answer result in an addendum. Questions must be submitted electronically through the PB System. Emails, phone calls, and faxes will not be accepted. Questions submitted to City staff will not be addressed and Bidder will be directed to the PB System. NIB -3 Non-Mandatory Pre-Bid Meeting . The engineering staff of the City's Harbor Department will conduct a pre-bid meeting at 9:00 a.m on July 29, 2025, in the 1st Floor Meeting Room, of the Port of Long Beach Maintenance Facility, 725 Harbor Plaza, Long Beach, CA 90802. Attendance is non-mandatory for the Contractors. It is not mandatory for Subcontractors but highly recommended. The City makes no guarantee that existing construction and site conditions matches construction depicted on record reference documents. It shall be the Bidder's responsibility to identify existing conditions. Bidders are encouraged to RSVP for the Pre-Bid Meeting through the PB System; located under the "RSVP" tab of the Prospective Bidder Detail. Following the meeting a list of Pre-Bid Meeting signed-in attendees will be available on the PB System. Note that attendance at the pre-bid meeting can be used to satisfy a portion of a Bidder's good faith efforts to meet the SBE/VSBE participation goals listed below. NIB -4 Summary Description of the Work. The Work required by this Contract includes, but is not limited to, the following: Asphalt pavement installation, milling, application of slurry sealing, miscellaneous pavement patching and repairing services, construction and repair of curbs, gutters and sidewalks, and installation of pavement markings, striping and signage. Refer to Section 01 11 00, Summary of Work in the Technical Specifications. NIB -5 Contract Time and Liquidated Damages. The Contractor shall achieve Affidavit of Final Completion of the Project within two (2) years as provided in Paragraph SC - 6.1 of the Special Conditions, from a date specified in a written "Notice to Proceed" issued by the City and subject to adjustment as provided in Section 8.2 of the General Conditions. FAILURE OF THE CONTRACTOR TO COMPLETE THE WORK WITHIN THE CONTRACT TIME AND OTHER MILESTONES SET FORTH IN THE SPECIAL CONDITIONS, INCLUDING THE ENGINEER'S APPROVAL OF AFFIDAVIT OF FINAL COMPLETION, WILL RESULT IN ASSESSMENT OF LIQUIDATED DAMAGES IN THE AMOUNTS ESTABLISHED IN THE SPECIAL CONDITIONS. NIB -6 Contractor's License. The Bidder shall hold either a current and valid Class "A" or Class "C-12", California Contractor's License to construct this project. NIB -7 Contractor Performed Work. The Contractor shall perform, with its own employees, Contract Work amounting to at least 30% of the Contract Price, except that any designated "Specialty Items" may be performed by subcontract. The amount of any such "Specialty Items" so performed may be deducted from the Contract Price before computing the amount required to be performed by the Contractor with its own employees. "Specialty Items" will be identified by the City on the Schedule of Bid Items. The bid price of any materials or equipment rental costs from vendors who are solely furnishing materials or rental equipment and are not performing Work as a licensed subcontractor on this project shall also be deducted from the Contract Price before computing the amount required to be performed by the Contractor with its own employees. NIB -8 SBE/VSBE. This project is subject to the Port of Long Beach (POLB) Small Business Enterprises (SBE)/Very Small Business Enterprises (VSBE) Program. The combined SBE/VSBE participation goal for this Project is fifteen percent (15%) of total bid value. The combined SBE/VSBE participation goal shall include a minimum zero percent (0%) of total bid value as VSBE. NIB -12 NOT USED NIB -13 Bid Security, Signed Contract, Insurance and Bonds. Each Bid shall be accompanied by a satisfactory Bidder's Bond or other acceptable Bid Security in an amount not less than ten percent (10%) of the Base Bid as a guarantee that the Bidder will, if Conditionally Awarded a Contract by the Board, within thirty (30) calendar days after the Contract is conditionally awarded to the Contractor by the City, execute and deliver such Contract to the Chief Harbor Engineer together with all required documents including insurance forms, a Payment Bond for one hundred percent (100%) of the Contract Price, and a Performance Bond for one hundred percent (100%) of the Contract Price. All Bonds shall be on forms provided by the City. NIB -14 Conditional Award of Contract and Reservation of Rights. The Board , acting through the Chief Executive Officer, reserves the right at any time before the execution of the Contract by the City, to reject any or all Bids, and to waive any informality or irregularity. The Conditional Award of the Contract, if any, will be to the responsible Bidder submitting the lowest responsive and responsible Bid. If the lowest responsive responsible Bidder fails to submit the required documents including insurance forms, bonds and signed Contract within thirty (30) calendar days after Conditional Award of Contract, the Board reserves the right to rescind the Conditional Award and Conditionally Award the Contract to the next lowest responsive and responsible Bidder. NIB -15 Period of Bid Irrevocability. Bids shall remain open and valid and Bidder's Bonds and other acceptable Bid Security shall be guaranteed and valid for ninety (90) calendar days after the Bid Deadline or until the Chief Executive Officer executes a Contract, whichever occurs first. NIB -16 Substitution of Securities. Substitution of Securities for retainage is permitted in accordance with Section 22300 of the Public Contract Code. NIB -17 Iran Contracting Act of 2010. In accordance with Public Contract Code sections 2200-2208, every person who submits a bid or proposal for entering into or renewing contracts with the City for goods or services estimated at $1,000,000 or more are required to complete, sign, and submit the "Iran Contracting Act of 2010 Compliance Affidavit.

Bid Results

Roads / Highways

$6,888,411.00

Public - City

Paving, Site Work

34

4

8

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
1
Bidding Soon
2,050
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2025

October 27, 2025

Project location map

To Be Determined, Long Beach, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.