BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 17, 2025 at 8:00 PM

Updated September 18, 2025

Site work for a water / sewer project in San Mateo, California. Completed plans call for site work for a water / sewer project.

As of September 17, 2025, this project has not yet been awarded. A timeline for award has not yet been established. Implement temporary stormwater mitigation measures to protect the CAN Vista Housing Hill area (behind the Community Clubhouse Building) during the upcoming rainy season. This scope addresses direct runoff from parking lots, nearby residences, and the Community Clubhouse Building roof that currently impacts the bioretention area and adjacent slope. For more details, contract requirements, and mandatory pre-bid onsite meetings information, see the attached Project Scope of Work document. Special Notices Prevailing wages must be paid to all workers employed on a public works project when the public works project is more than $1,000. Construction Payment and Performance Bonds are required if the quote exceeds $25,000. Question Deadline 07/25/2025 at 4:00 PM PT Online Q&A Yes Start/Delivery Date September 1, 2025 Implement temporary stormwater mitigation measures to protect the CAN Vista Housing Hill area (behind the Community Clubhouse Building) during the upcoming rainy season. This scope addresses direct runoff from parking lots, nearby residences, and the Community Clubhouse Building roof that currently impacts the bioretention area and adjacent slope. 1. Facilities Maintenance & Facilities Planning Site Assessment and Background _ Key findings: o A 6-inch diameter pipe collects runoff from a portion of the parking lot and two residential lots and discharges into a bioretention area on the hillside. (Reference pics 1 and 2- Attachment #1) o Four roof downspouts from the Community Building discharge directly onto the hill, contributing to erosion and overloading the bioretention feature. (Reference pic 3 - Attachment #1) 2. Temporary Stormwater Mitigation Measures 2.1 Pipe Re-routing _ Connect the exposed 6" pipe to the existing storm drain system from the bioretention area: o Verify compatibility with stormwater box capacity and condition. o Ensure proper flow direction and elevation adjustments. 2.2 Downspout Redirection _ Redirect the four Community Clubhouse Building downspouts that currently discharge onto the hillside: o Install a gutter and piping system to convey flow to the existing concrete drainage channel south of the building. o Install a 4" minimum flexible drain pipe at the downspouts to route the rainwater to the bottom of the hillside on the Loop Road or connect to the existing underground storm drain system in the same vicinity. 3. Erosion Control and Slope Stabilization _ Install erosion control measures to reinforce the hillside until permanent improvements can be made: o Sediment retention fiber rolls (wattles) at slope intervals to slow runoff and capture sediment. o Natural fiber erosion control blankets on exposed soils to prevent surface erosion. o Temporary seeding with grass and native groundcover to promote slope stabilization and infiltration. Contract Requirements: The selected contractor will be required to agree to the District's Facilities Services Master Agreement contract documents. A sample copy can be provided upon request.

Bid Results

Water / Sewer

$39,767.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
534
Active Projects
269
Bidding Soon
2,792
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2025

September 1, 2025

Project location map

To Be Determined, San Mateo, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.